My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />October 27, 2020 <br />Page 3 <br />affected populations (e.g., sensitive receptors), not because they work for a particular employer or <br />have families whose students attend a particular school"].) Without consideration of these factors, <br />it is impossible for the lead agency and public to assess the extent of any safety impacts posed by <br />the Project on the District's students, families, and staff. Such an analysis of safety impacts is <br />critical to the determination of whether the Project will impact the District's ability to provide <br />public services and whether the Project will have traffic/transportation impacts (as discussed <br />below). <br />The Draft EIR, as modified by the Final EIR, likewise continues to fail appropriately to consider <br />the District's needs at Sequoia High School beyond the issue of overcrowding, and the District's <br />overall facilities capacity and needs (as opposed to just the District's capacity at Sequoia High <br />School). By only addressing the District's current capacity at, and the Project's impacts on <br />Sequoia High School in isolation, the Final EIR presents a misleading picture regarding the <br />District's ability to provide adequate facilities needed to house additional enrollment. As <br />explained in the July 13 letter, such a surface level description of school facilities is inconsistent <br />with the requirements of CEQA. <br />III. Analysis of Impacts Related to Schools <br />A. Impacts on Schools <br />The Draft EIR, as modified by the Final EIR, maintains an inadequate discussion of impacts on <br />schools. The Initial Study, which is relied upon by the Draft EIR and the Final EIR, states that <br />the proposed Project would have a significant impact on schools if it would: <br />Result in substantial adverse physical impacts associated with the provision of new or <br />physically altered governmental facilities, or the need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental <br />impacts, in order to maintain acceptable service ratios, response times, or other <br />performance objectives [for the provision of school services]. <br />The Initial Study, Draft EIR, and now the Final EIR have all concluded that, because the <br />District's Sequoia High School would have enrollment capacity to accommodate any students <br />generated by the proposed Project at Sequoia High School, the Project would not result in a <br />significant impact to schools. Further, the Final EIR again relies on SB 50 (Stats. 1998, Ch. 407) <br />for the conclusion that payment of the applicable school impact fee is deemed to be full and <br />complete mitigation under CEQA for impacts on school facilities. (Final EIR at 3-5.) As <br />explained in the District's July 13 letter and incorporated herein, this short and conclusory <br />analysis is flawed. <br />The Draft EIR, as modified by the Final EIR, fails to provide sufficient information needed to <br />analyze all potential impacts of the Project under the stated Public Services threshold of <br />significance, including but not limited to: (1) whether the influx of students would require <br />"physically altered" school facilities; (2) whether other impacts of the proposed Project, such as <br />increased traffic in the neighborhood surrounding Sequoia High School, could impact the <br />District's use or need for new or physically altered school facilities; and (3) whether other <br />
The URL can be used to link to this page
Your browser does not support the video tag.