Laserfiche WebLink
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />October 27, 2020 <br />Page 7 <br />increase the severity of any impacts previously analyzed. (See, Appendix CNA at 1-1 — 1-2.) <br />Because the construction and operation of the proposed Project on Parcel F will pose new and/or <br />more significant school and school -related impacts that were not analyzed in the DTPP, <br />including impacts on the District's ability to provide its public service and transportation/traffic <br />impacts related to schools and student safety (as discussed above and in the July 13 letter), the <br />Draft and Final EIRs reliance upon the DTPP was legally improper. On these grounds, which <br />have not been adequately addressed in the Final EIR, the District hereby maintains its objections <br />to the streamlining mechanism relied upon in the Draft and Final EIRs. <br />V. Improper "Piecemeal" Review of Project <br />CEQA forbids "piecemeal" review of the significant impacts of a project. (Aptos Council v. <br />County of Santa Cruz (2017) 10 Cal.App.5th 266, 277-278.) As noted in the July 13 letter, the <br />Draft EIR defines the Project to include development on Parcels A -F. (See, Draft EIR at 2-8.) <br />However, the Draft EIR, in reliance on the Initial Study, primarily focuses on impacts to be <br />caused by development of Parcels A-E. Meanwhile, the environmental analysis for development <br />of the Project on Parcel F is mostly contained in the Consistency Analysis attached as Appendix <br />CNA to the Draft EIR. By splitting up the Project into component pieces, the Draft EIR fails to <br />demonstrate accurately the Project's anticipated impacts as a whole. <br />The Final EIR states that "[s]ite-specific Parcel F impacts with other proposed project <br />development on Parcels A through E are analyzed in" the "air quality (construction emissions, <br />health risks, and carbon monoxide hotspots); greenhouse gases and climate change; and <br />transportation" sections of the Draft EIR. (Final EIR at 3-34.) The District did not dispute that <br />some impacts of development on Parcel F were also included within the Draft EIR's analysis of <br />the Project as a whole. However, it appears that Parcel F was excluded from several other <br />portions of the Draft EIR, including portions of the traffic/transportation section. For instance, <br />and as previously noted, in analyzing whether the Project conflicts with any programs, plans, <br />ordinances, or policies addressing the circulation system, and in assessing whether the Project <br />would substantially increase hazards or result in inadequate emergency access, it does not appear <br />that the Draft EIR considers the impacts of development on Parcel F throughout the analysis. <br />(See, e.g., Draft EIR Figures 3.5-1C, 3.5-2, and 3.5-3, which do not specifically depict Parcel F.) <br />It is likely that development on Parcel F, combined with development on Parcels A-E, would <br />have more significant impacts on traffic/transportation than development on Parcels A-E, alone. <br />By largely confining the analysis of Parcel F to the Consistency Analysis, the Draft EIR <br />understates the Project's impacts on traffic/transportation, in violation of CEQA. <br />It also remains unclear from the Final EIR whether the Draft EIR considers the Project as a <br />whole in analyzing impacts to Public Services, including to the District. Development of new <br />residential units on Parcels A-E may not individually have a significant impact on the District's <br />need for new or physically altered school facilities in order for the District to maintain its <br />performance objectives. However, adding a six -story residential complex that will be <br />approximately 0.2 miles closer to the District's Sequoia High School on El Camino Real would <br />likely amplify any impacts caused by a new mixed-use development on Parcels A-E. <br />Accordingly, the District reiterates its assertions that impacts on public services caused by <br />Parcels A -F must be considered together, rather than separately. <br />