My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res20 15907
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2020
>
Res20 15907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 3:24:40 PM
Creation date
11/19/2020 3:23:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Special
Agency Type
City Council
Date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/16/2020 <br />13. Geology, Soils and Seismicity Impact GEO-7f: The project could directly or <br />indirectly destroy a unique paleontological resource or site or unique geological feature. <br />Mitigation Measures. Mitigation Measure GEO-2 will be implemented for the <br />Project as provided in the MMRP. <br />Findings Regarding Impact GEO-7f: The City Council hereby finds that <br />incorporating the requirements of Mitigation Measure GEO-2 into the Project would <br />substantially lessen the severity of Impact GEO-7f, such that this potential impact <br />would be less than significant, because this measure requires procedures for <br />inadvertent discovery of paleontological resources, including halting all work if such <br />resources are encountered during construction and specific steps be taken to <br />protect and preserve significant paleontological resources. This finding is based on <br />the entire record of proceedings for the Project, including but not limited to the <br />discussion and analysis set forth on pages GEO 4.7-7 through GEO 4.7-9 of the <br />Initial Study, which includes a full statement of the impact and applicable mitigation <br />measures and is hereby incorporated herein in its entirety. <br />14. Hazards and Hazardous Materials Impact HAZ-9a: The project could create a <br />significant hazard to the public or the environment through the routine transport, use, or <br />disposal of hazardous materials. <br />Mitigation Measures. Mitigation Measures HAZ-1 and HAZ-2 will be <br />implemented for the Project as provided in the MMRP. <br />Findings Regarding Impact HAZ-9a. The City Council hereby finds that <br />incorporating the requirements of Mitigation Measures HAZ-1 and HAZ-2 into the <br />Project would substantially lessen the severity of Impact HAZ-9a, such that this <br />potential impact would be less than significant, because Mitigation Measure HAZ- <br />1 requires hazardous building materials survey prior to building permit issuance for <br />demolition or renovation activities and abatement, including procedures to remove <br />and dispose of hazardous material, and Mitigation Measure HAZ-2 requires a site <br />mitigation plan prior to the issuance of a grading permit and before any substantial <br />ground disturbance. This finding is based on the entire record of proceedings for the <br />Project, including but not limited to the discussion and analysis set forth on pages <br />HAZ 4.9-2 through HAZ 4.9-5 of the Initial Study, which includes a full statement of <br />the impact and applicable mitigation measures and is hereby incorporated herein in <br />its entirety. <br />15. Hazards and Hazardous Materials Impact HAZ-9b: The project could create a <br />significant hazard to the public or the environment through reasonably foreseeable upset <br />and accident conditions involving the release of hazardous materials into the environment. <br />Mitigation Measures. Mitigation Measures HAZ-1 and HAZ-2 will be <br />implemented for the Project as provided in the MMRP. <br />ATTY/RESO.0118/PC RESO SOUTH MAIN MIXED -USED PROJECT <br />REV: 11-03-2020 PR <br />Page 22 of 32 <br />RESO. NO. 15907 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.