My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res20 15907
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2020
>
Res20 15907
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 3:24:40 PM
Creation date
11/19/2020 3:23:59 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Special
Agency Type
City Council
Date
11/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11/16/2020 <br />but not limited to the discussion and analysis set forth on page GEO 4.7-5 of the <br />Initial Study, which includes a full statement of the impact and applicable mitigation <br />measures and is hereby incorporated herein in its entirety. <br />11. Geology, Soils and Seismicity Impact GEO-7c: The project could be located on <br />a geologic unit or soil that is unstable or that could become unstable as a result of the <br />project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, <br />liquefaction, or collapse. <br />Mitigation Measures. Mitigation Measure GEO-1 will be implemented for the <br />Project as provided in the MMRP. <br />Findings Regarding Impact GEO-7c. The City Council hereby finds that <br />incorporating the requirements of Mitigation Measure GEO-1 into the Project would <br />substantially lessen the severity of Impact GEO-7c, such that this potential impact <br />would be less than significant, because this measure requires the Project to <br />provide a final geotechnical report prior to final project design based on additional <br />site investigations, including determination of the presence of expansive soils, as <br />necessary and implementing geotechnical recommendations for foundation design <br />or other measures to conform to the California Building Code, to reduce potential <br />hazards from unstable soils. This finding is based on the entire record of <br />proceedings for the Project, including but not limited to the discussion and analysis <br />set forth on page GEO 4.7-6 of the Initial Study, which includes a full statement of <br />the impact and applicable mitigation measures and is hereby incorporated herein in <br />its entirety. <br />12. Geology, Soils and Seismicity Impact GEO-7d: The project could be located on <br />expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating <br />substantial direct or indirect risks to life or property. <br />Mitigation Measures. Mitigation Measure GEO-1 will be implemented for the <br />Project as provided in the MMRP. <br />Findings Regarding Impact GEO-7d. The City Council hereby finds that <br />incorporating the requirements of Mitigation Measure GEO-1 into the Project would <br />substantially lessen the severity of Impact GEO-7d, such that this potential impact <br />would be less than significant, because this measure requires the Project to <br />provide a final geotechnical report prior to final project design based on additional <br />site investigations, including determination of the presence of expansive soils, as <br />necessary and implementing geotechnical recommendations for foundation design <br />or other measures to conform to the California Building Code, including retaining a <br />qualified geotechnical engineer during construction so that recommendations can <br />be revised, if necessary, to reduce potential hazards from expansive soils. This <br />finding is based on the entire record of proceedings for the Project, including but not <br />limited to the discussion and analysis set forth on pages GEO 4.7-6 through GEO <br />4.7-7 of the Initial Study, which includes a full statement of the impact and applicable <br />mitigation measures and is hereby incorporated herein in its entirety. <br />ATTY/RESO.0118/PC RESO SOUTH MAIN MIXED -USED PROJECT <br />REV: 11-03-2020 PR <br />Page 21 of 32 <br />RESO. NO. 15907 <br />MUFF NO. 601 <br />
The URL can be used to link to this page
Your browser does not support the video tag.