My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 5:27:49 PM
Creation date
11/19/2020 6:20:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/23/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 24 of 27 <br />2. Testing shall be performed in the presence of a County inspector. The Consultant shall <br />give a minimum of 48-hour notice to the local regulatory agency. <br />3. Testing shall be performed without shutting down the site. <br />4. The service technician shall maintain all systems to tile standards of the manufacturer, <br />including the addition of any new requirements of the governing authorities, <br />5. The service technician shall use a method of continuous monitoring that automatically <br />monitors the integrity of both the primary and secondary containment, such as <br />components that are hydrostatically monitored or under constant vacuum or pressure. <br />6. Testing shall include, but not be limited to, the following components: dispenser pans, <br />tank annular spaces, secondary lines, and piping/fill sumps. <br />7. The service technician shall prepare a report and review any outstanding issues, violations, <br />or failed inspection items with City personnel. Recommendations for repair and pricing <br />estimates shall be provided as necessary. The technician shall record the result on the <br />"Secondary Containment Testing Report Form" and submit it to the City and County <br />within 30 days of the completion of the inspection and include a copy of the test procedure <br />used and any documentation required to determine the results. <br />G. Annual Designated Operator Facility Employee Training (UST/AST) <br />1. An ICC certified California designated UST operator shall provide training on an annual <br />basis to facility employees who have responsibilities associated with the operation and/or <br />maintenance of UST/AST systems and to new employees within 30 days of date of hire. <br />2. The training must include, but is not limited to, the following items as specified in Title <br />23 CCR Chapter 16: <br />i. The operation of the UST and/or AST system in a manner consistent with the <br />facility's Best Management Practices. <br />H. The facility employee's role with regard to UST and/or AST monitoring <br />equipment as specified in the facility's UST/AST monitoring plan and/or. Spill, <br />Control, and Countermeasure (,SPCC) plan. <br />M. The facility employee's roles with regard to spills and overfills as specified in the <br />facility's UST/AST response plan. <br />iv. The name of the contact person(s) for emergencies and monitoring equipment <br />alarms. <br />H. Annual Secondary Containment Inspection and Testing (AST) <br />1. Consultant shall perform Secondary Containment Testing as required by 40 CFR 112 <br />annually for each AST location in accordance with the manufacturer's guidelines or <br />standards. <br />2. Testing shall be performed in the presence of a County inspector. The Consultant shall <br />give a minimum of 48-hour notice to local regulatory agency. <br />3. Testing shall be performed without shutting down the site. <br />4. The service technician shall maintain all systems to the standards of the manufacturer, <br />including the addition of any new requirements of the governing authorities. <br />S. The service technician shall use a method of continuous monitoring that automatically <br />monitors the integrity of both the primary and secondary containment, such as <br />components that are hydrostatically monitored or under constant vacuum or pressure. <br />6. Testing shall include, but not be limited to, the following components: dispenser pans, <br />tank annular spaces, secondary lines, and piping/fill sumps. <br />REV: 11-18-19 EI <br />ATTY/ArR2019.2941TEC Accutite, Inc. (Page 16 of 19) 242 <br />
The URL can be used to link to this page
Your browser does not support the video tag.