My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 5:27:49 PM
Creation date
11/19/2020 6:20:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/23/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
840
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 25 of 27 <br />7. The service technician shall prepare a report and review any outstanding issues, violations, or <br />failed inspection items with City personnel. Recommendations for repair and pricing estimates <br />shall be provided as necessary. All reports shall be submitted within 30 calendar days of the <br />completion of the inspection. <br />Integrity Testing (AST) <br />I. A certified inspector shall perform integrity testing as required at each AST location in <br />accordance with US Environmental Protection Agency Oil Spill Prevention regulations found in <br />40 CFR 112.8(c) and the Spill Prevention, Control, and Countermeasure (SPCC) rule. <br />2. The Consultant's personnel trust have a valid tank testing license from the State Water Resources <br />Control Board and be certified in the American Petroleum Institute (API) Standard 653 and/or <br />the Steel Tank Institute (STI) SP001 inspection standards in order to provide tank integrity <br />testing. <br />3. Integrity testing shall be performed according to American Petroleum Institute (API) Standard <br />653 and/or Steel Tank Institute (STI) Standard SP001 at each AST location per schedule/every <br />5 years or as specified by the City. <br />4. Examples of integrity tests include, but not be limited to, visual inspection, hydrostatic testing, <br />radiographic testing, ultrasonic testing, acoustic emissions testing, or other systems of non- <br />destructive testing. <br />5. The Consultant shall also inspect the outside of the container for signs of deterioration, <br />discharges, or accumulation of oil inside diked areas. <br />6. The results of the integrity testing shall be submitted to the City and County within 30 days of <br />inspection and must include a copy of the inspection procedure used and any documentation <br />required to determine the results. <br />J. Annual Gasoline Dispensing Facilities (GDF) Testing (UST/AST) <br />1. Gasoline Dispensing Facility (GDF) Testing <br />i. Consultant's certified personnel shall conduct performance testing and inspection of <br />GDF vapor recovery and control equipment on an annual basis and in the presence of a <br />Bay Area Air Quality Management District (BAAQ.MD) and. County Inspector (if <br />required). <br />ii. The Consultant shall give a minimum of a 48-hour notice to local regulatory agencies <br />prior to the performance of gasoline dispensing facility (GDF) testing per BAAQNM <br />Regulation 8-7-301 and 302. <br />M. Upon completion of testing, GFD test results shall be submitted to the BAAQMD Source <br />Test Section, within 20 days of the test date. <br />California Air Resources Board (CARB) Vapor Recovery Certification <br />L The Consultant shall comply with Enhanced Vapor Recovery (EVR) requirements in <br />accordance with CARR Executive Order VR -102 and Executive Order VR -204 for <br />Phase II systems. <br />K. Additional Services <br />1. "Additional Services" is defined as any additional monitoring, inspection, and testing the City may <br />require above the monitoring, inspection and testing required by Section 1.4, Subsections A -J, or <br />any repair or replacement work necessary as a result of the inspection and testing process. <br />Additional Services shall be offered by the Consultant on a time and materials basis at the rates <br />provided in the Additional Services table delineated in Section 1.5 below. <br />1.5_ Payment TertMs <br />REV: 11-18-19 EI <br />ATTY/AGR.2019.294lTEC Accutite, Inc. (Page 17 of 19) 243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.