Laserfiche WebLink
6.G. - Page 79 of 124 <br />ATTACHMENT B <br />October 14, 2020 <br />Any and all body attachments shall be installed using a rubber gasket material and attachment caulked <br />to prevent water leakage. <br />Vehicle Lighting: <br />Completed vehicle shall comply with FMVSS108 & CVG regulations. L.E.D. Stopltailttum lights and back-up <br />lights shall be flush mounted, "Trucklite ' or equal. Side marker lights may be Trucidge No.1 integral <br />refle ctorAight. All wiring both internal and external to be loomed and fully protected. All lights vAll be LED. <br />Final Stage Manufacturer: <br />Shall cer ity complete functionality of the completed unit per Federal DOT Regttdatbm for Final. Stage <br />Marnufactarring, Decal shall be located an the driver's door. <br />Drawings: <br />Drawings for the body will be provided for customer approval prior to production. <br />Pre- Construction Meetinci: <br />A visit to the installer's facility to inspect the chassis, body and other equipment is recommended. This meeting <br />YAR be conducted prior to installing and manufacturing some of the equipment.: Drawings may be provided for <br />approval at or before this meeting. <br />Pre -Paint!_ Final Inspection: <br />The customer v+iill be notified capon request prior to the truck being painted to allowfor inspection. <br />Customer is responsible for their travel arrangements. <br />Price excluciing chassis: S69,832.00 <br />2% discount net 10 days -1.5 % Interest on oak standing past 30 <br />Price does not include tax or licenses fees <br />F.Q.B. Redwood City, CA <br />s Page 7 <br />327 <br />4-1 <br />