Laserfiche WebLink
6.E. - Page 32 of 272 <br />E -Tech, Inc. References <br />Verizon 513 <br />Location: San Jose, CA <br />Mlbmmm <br />Completion Date: Multiple sites completed in 2019 and p12020 <br />E -Tech led the build out of Verizon Wireless' 5G project throughout San Jose, CA which <br />included over 40 sites. E -Tech was one of the largest companies to self -perform the work. <br />The company worked closely with the City of San Jose and the engineering department to <br />solve a key design issue in order to meet the City code for the deployment. The scope of <br />work included all of the civil and electrical work to build light poles and utility poles to hold <br />antennas and radios used for the 5G network. <br />Tesla Motors <br />Location: Northern California <br />M I& <br />Completion Date: Multiple projects completed since 2017 <br />E -Tech is one of the leading builders of Tesla Super Charging stations in California and has installed multiple Super <br />Chargers in over 20 ports throughout Northern California, including the Tesla plant in Freemont. The scope of work for the <br />project includes all the civil and electrical work to tie the stations to the electric grid. <br />Copyright D2020 Cleve roti System: Gm6H. Information contained in this oocw1wz is (OnfidentaI and piop,iel",� <br />25 <br />86 <br />