My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Bear Electrical Solutions, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Bear Electrical Solutions, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 4:31:32 PM
Creation date
1/20/2021 4:25:23 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bear Electrical Solutions, Inc.
PROJECT NAME
Electrical Construction Services
RMP File Number
304
Date
1/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. Standards; Compliance. Contractor must, at all times, ensure that the Work is <br />performed in an efficient, skillful manner following best practices and in full <br />compliance with the Agreement and all applicable laws, regulations, codes, <br />standards, and permits, including City's municipal code, rules, and regulations, <br />and any orders of the administrative or judicial bodies with jurisdiction over the <br />Work. <br />E. Correction of Defects. Contractor must promptly correct, at Contractor's sole <br />expense, any Work that is determined by City to be deficient or defective in <br />workmanship, materials, parts, or equipment. City may elect to retain defective <br />Work and deduct the difference in value, as determined by the City's project <br />manager, from payments otherwise due to Contractor. <br />1.3 QUALITY ASSURANCE <br />A. Manufacturer's certificates showing conformance with this specification shall be <br />delivered with each shipment of materials and equipment delivered to the job site. <br />B. Only City inspected and approved material may be used. <br />C. Codes and Standards <br />1. The standards, recommended methods and tests contained in the <br />publications cited below shall determine the standards for the work to be <br />done hereunder unless otherwise specifically designated on the plans: <br />a. The California Manual on Uniform Traffic Control Devices (California <br />MUTCD), latest edition. <br />b. The regulations, standards, and tests of the State of California <br />Department of Transportation Materials and Research Division. <br />C. The State of California Standard Plans and Standard Specifications, <br />and applicable related Standard Special Provisions. <br />2. Reference by manufacturers, brands or models is to establish type and <br />quality of materials desired. Substitutions of materials of equal quality will <br />be permitted upon the prior written approval. <br />1.4 SUBMITTALS <br />A. The Contractor must submit, as one package, RRFB product data and <br />manufacturer's instructions including: <br />1. Rectangular Rapid Flashing Beacons <br />2. Pole and Foundation <br />3. Pedestrian Signage <br />REV: 12-21-2020 PR <br />ATTY/AGR.2020.306/Bear Electrical Solutions (Page 13 of 35) <br />
The URL can be used to link to this page
Your browser does not support the video tag.