Laserfiche WebLink
<br /> <br />City of Redwood City <br /> <br />preparing for and assisting the City in leading the scoping meetin& MHA I RMT will <br />prepare a PowerPoint presentation for use during the meeting. It is anticipated that <br />the presentation will: <br /> <br />· Describe the key elements of the proposed project <br /> <br />· Address the requirements for and content of the EIR <br /> <br />· Present the basic elements of the CEQA process <br /> <br />· Identify the probable areas of environmental concern based on data <br />reviewed during Elements 1.1 and 1.3 <br /> <br />· Identify opportunities to comment on the scope and content of the EIR <br /> <br />MHA I RMT will prepare a summary of comments received during the scoping <br />meetin& as well as those received during the NOP review period. <br /> <br />Element 2: Administrative Draft EIR <br /> <br />MHA I RMT will prepare an Administrative Draft EIR for review and comment by City <br />staff. The Administrative Draft EIR will be prepared in accordance with all applicable <br />provisions of CEQA, and will be submitted to City staff for review and comment prior <br />to preparation and circulation of the Draft EIR. <br /> <br />Based on MHA I RMT's current understanding of the proposed project, MHA I RMT has <br />identified 11 parameters that are expected to be key elements of the EIR. The parameters <br />include: <br /> <br />Aesthetics <br /> <br />Air Quality <br />Biological Resources <br />Cultural Resources <br /> <br />Geology, Soils, and Seismicity <br />Hydrology and Water Quality <br />Land Use and Planning <br />Noise <br /> <br />Public Services <br />Traffic and Transportation <br />Utilities <br /> <br />Janumy 11, 200g <br />AMY <br /> <br />10 <br />