My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 MHA/RMT
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 MHA/RMT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2010 11:28:26 AM
Creation date
4/16/2008 11:19:44 AM
Metadata
Fields
Template:
Agreement
Contractor Name
MHA/RMT
PROJECT NAME
Environmental Impact at Laurel Way CEQA
RMP File Number
304
Date
4/14/2008
MO Ref
09-134, 10-158
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />City of Redwood City <br /> <br />. The Final EIR will consist of comments received on the Draft EIR, responses to the <br />comments, .errata to the Draft EIR based on comments and responses, and any necessary <br />additional analysis and mitigation measures warranted by comments and responses; the <br />Final EIR will not include reprinting of the Draft EIR. <br /> <br />. Preparation of responses to comments received on the Draft EIR is limited to the total hours <br />allocated to the task identified in the project budget (Attachment C); if the volume of <br />comments requires resources beyond those identified in the budget, or if the comments <br />require additional data collection and/or analyses, MHA I RMT will advise the City prior to <br />the commencement of work on the Final EIR; this may include transferring the preparation <br />of some responses to City staff, and/or a budget augment. <br /> <br />. The City Attorney or the Assistant City Attorney will participate with MHA I RMT in the <br />preparation of the Administrative Findings and Statements of Overriding Considerations. <br /> <br />. Distribution of notices required by CEQA (NOP, NOC, NOD) and those required for public <br />hearings will be the responsibility of MHA I RMT. <br /> <br />. Distribution of copies of the Draft and Final EIR will be the responsibility of MHA I RMT. <br /> <br />. The number of copies of each of the deliverables is presented in this proposal under the <br />Deliverables heading. MHA I RMT will provide additional copies beyond those specifically <br />listed in under the Deliverable heading on a time and materials basis. <br /> <br />. MHA I RMT has assumed that the City's review of the Administrative Draft IS, <br />Administrative Draft EIR, and Administrative Final EIR will require no more than two (2) <br />weeks each. <br /> <br />. Additional studies not identified in this proposal that may become necessary during the <br />course of the project will require review for effects on scope and budget. Such additional <br />studies could include, but are not limited to, expansions of the studies submitted by the <br />applicant in order to assess the potential impacts of the project alternatives, or the peer <br />review of such expanded studies. <br /> <br />. The evaluation of project alternatives will not require the preparation of additional technical <br />studies. <br /> <br />. MHA I RMT may reallocate time and budget among the MHA I RMT team and among the <br />identified tasks without further approval by the City. <br /> <br />. The City will assist the MHA I RMT team in securing access to the project area, including <br />securing permission to cross any intervening properties not under the direct control of the <br />City. <br /> <br />Schedule <br /> <br />MHA I RMT can begin work on the project immediately upon receiving the City's notice to <br />proceed. We propose to deliver the Administrative Draft IS to you five weeks from receipt of all <br /> <br />January 11, 200S <br />RMT <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.