My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Craftwater
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Craftwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 2:30:53 PM
Creation date
2/12/2021 8:07:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Craftwater
PROJECT NAME
Design Professional Services
RMP File Number
304
Date
2/11/2021
MO Ref
21-008, 21-142
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Red Morton Park Regional Stormwater Capture Project <br />Redwood City, CA <br />Task 1.3. Project Administration <br />The Consultant will provide the City with a written monthly progress report and phone call updates as requested <br />and needed for the course of the project. The progress reports will contain a summary of the expenditures to the <br />total contract, tracking of work performed, deliverables submitted, and planned activities for the upcoming <br />month. <br />A monthly invoice for work performed will be prepared and submitted for the work performed on the first day of <br />each month. The invoice will be included as part of the monthly progress report. <br />Task 1. Deliverables: <br />• Monthly Progress Reports and Invoices <br />• Meeting Materials. The Consultant will prepare agendas, meeting handouts/materials, and meeting <br />summary notes (including an action items list) for each in-person progress meeting after each design <br />submittal. <br />• Project Schedule and Updates. An initial schedule has been developed as a part of this proposal and <br />will be updated to act as the initial project schedule upon signature of contract. Through the course of <br />the project, an updated project schedule outlining the activities and milestones will be provided at each <br />progress meeting. <br />Task 2. Preliminary Studies <br />The Consultant will collect data as necessary to inform the preliminary design concept of the project. All data <br />received and researched through desktop analysis will be field verified as necessary. <br />Task 2.1. Records Research <br />The Consultant will conduct an investigation of the available records that the City of Redwood City may have to <br />verify the existence of any underlying encumbrances to Red Morton Community Park, the drainage culvert, <br />access and any future development of the park. All available maps, planning documents, park master plans, <br />engineering plans, and easements found will be shown on the existing site plan. <br />Task 2.2. Data Review <br />The Consultant will prepare a Data Collection Workplan outlining the studies anticipated to be requested and <br />reviewed. Said data may be consist of previous watershed studies, site specific hydrology and hydraulic studies, <br />received research material from Task 2.1, past topographic surveys, past community involvement, as well as <br />construction as-builts, other engineering studies, landscape plans, irrigation plans, planning and park master <br />plan documents for Red Morton Community Park. <br />Task 2.3. Survey <br />The project team will conduct a topographic survey and perform detailed investigations of the site in order to <br />allow the design team to understand above ground and potentially subsurface constraints that may limit the <br />project footprint. These items may include, but are not limited to, tree canopies, above ground infrastructure, <br />storm drain invert elevations, street centerlines, sidewalks and existing utilities, fences, and park amenities. <br />Field survey of the site will include invert elevation, pipe diameter and direction of flow for underground utilities, <br />tree trunk location and size, fences, sports amenities, field extents and surface characteristics, hardscapes, <br />vegetation, and above ground structures. <br />The topographic survey will be comprised of two major portions: ground survey and aerial photogrammetry. Two <br />days of field survey and one day to set aerial targets have been assumed to obtain supplemental survey data <br />that is obscured, as well as collect field invert data available. The Consultant will coordinate with the City of <br />Redwood City for access to the rectangular box culvert to collect the culvert inverts. The Consultant will place <br />and survey targets for the aerial survey. <br />The Consultant will provide the following products and services: <br />ATTY/AGR.2020.309/Craftwater Inc (Page 13 of 34) <br />
The URL can be used to link to this page
Your browser does not support the video tag.