My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Craftwater
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Craftwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 2:30:53 PM
Creation date
2/12/2021 8:07:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Craftwater
PROJECT NAME
Design Professional Services
RMP File Number
304
Date
2/11/2021
MO Ref
21-008, 21-142
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Red Morton Park Regional Stormwater Capture Project <br />Redwood City, CA <br />30%, 60% design and 90% design levels. The Consultant will attend design review workshops after each design <br />submittal. Documents to be reviewed shall be submitted a minimum of one (1) week prior to each meeting. <br />Task 6.1.30% PS&E <br />For the 30% design submittal, the project team will develop plans to the 30% level overall. Approximately 60% <br />of the civil design drawings will be developed to some degree and many will be nearly complete. Outline <br />specifications and cost estimates will be prepared. <br />The 30% submittal will mostly consist of plan sheets to provide more detail than was originally included in <br />the Preliminary Design Concept Report, and address comments from Redwood City. The structural, <br />mechanical and electrical design features will be further refined at the 60% design level to verify pump <br />station sizing, piping layout and initial consultation with Pacific Gas and Electric Company (PGE). <br />The cost estimate from the Preliminary Engineering Concept Design Report will be updated. <br />Hard copies and digital electronic files of 30% Plans, Outline specifications, and Cost Estimate will be submitted. <br />It is assumed that a 30% Design Workshop will be convened at a location to be named by the City, with the <br />availability of teleconferencing the supporting design team, approximately two (2) weeks following receipt of the <br />30% Design Submittal. A review comment matrix will be prepared to capture review comments and responses <br />of all comments. The responses will be meaningful and descriptive enough to allow for the City Project Manager <br />to fully understand the nature of the comment and how the comment was closed. <br />The team will support the City with any presentations relevant to the City Commission and/or Council. <br />Most plan sheets will be at 1" = 20' scale. Consultant anticipate including a few plan sheets that will show overall <br />layouts, and these may be at 1" = 50' scale. In addition, it may be necessary for us to include a few detailed <br />plans, at a larger scale such as 1" = 10'. The hydraulic profile of the system will be shown where applicable. <br />The Consultant has estimated that approximately 83 sheets will be developed for the final deliverable, in <br />AutoCAD format. <br />TITLE TITLE <br />G-1 <br />Title Sheet <br />G-2 <br />Sheet Index, Abbreviations, General <br />Notes <br />G-3 <br />Notice to Contractors <br />G-4 <br />Notice to Contractors <br />G-5 <br />Boring Logs <br />G-6 <br />Overall Construction Sequence Plan <br />(1" = 50') <br />C-1 <br />Site Plan (1" = 50") <br />C-2 <br />Erosion Control Plan (1" = 50') <br />C-3 <br />Demolition Plan (1"=20') <br />C-4 <br />Demolition Plan (1"=20') <br />C-5 <br />Demolition Plan (1"=20') <br />C-6 <br />Demolition Plan (1"=20') <br />C-7 <br />C-8 <br />Horizontal Control Plan (1"=20') <br />Horizontal Control Plan (1"=20') <br />C-9 <br />Horizontal Control Plan (1"=20') <br />C-10 <br />Horizontal Control Plan (1"=20') <br />C-11 <br />Diversion Structure, Pretreatment, <br />and Storm Drain Plan and Profile <br />C-12 <br />Underground Storage Layout <br />C-13 <br />Underground Storage Layout <br />C-14 <br />BMP Schematic Plan <br />C-15 <br />Precise Grading Plan (1" = 20') <br />C-16 <br />Precise Grading Plan (1" = 20') <br />C-17 <br />Precise Grading Plan (1" = 20') <br />C-18 <br />Precise Grading Plan (1" = 20') <br />ATTY/AGR.2020.309/Craftwater Inc (Page 25 of 34) <br />
The URL can be used to link to this page
Your browser does not support the video tag.