Red Morton Park Regional Stormwater Capture Project <br />Redwood City, CA <br />Task 9. Construction Support Services <br />The Consultant will provide design support services during the construction phase of the Regional Stormwater Capture <br />Project at Red Morton Community Park and will be on hand to assist the City with office support, including: shop drawing <br />submittal review, assisting with Requests for Information (RFI), making changes to the plans in the event a change order <br />is processed or a change in the design is desired, and providing limited construction observation support as needed. <br />The basis of the effort shown below is based on the team's extensive experience in designing and providing construction <br />support on similar regional stormwater capture projects. The services and effort listed can be expanded or contracted <br />based on the City's needs. The services should be reviewed prior to the commencement of construction and should be <br />periodically discussed between the team and the City's Project Manager. <br />Task 9.1. Meeting Support <br />The Consultant will attend a one -day pre -construction conference to be held with the successful construction Contractor, <br />City personnel, and other relevant personnel. The Consultant will take notes and produce meeting minutes, as <br />appropriate, to be provided to the City for distribution. <br />Task 9.2. Submittal Reviews <br />The Consultant will review shop and work drawings of fabricated and manufactured equipment forwarded to us by the <br />City, for substantial conformity with the intent of the contract documents. Ten (10) to fifteen (15) calendar days is <br />scheduled from receipt by the team to date of return of the reviewed submittal copies. The level of effort required for this <br />task depends on the number of submittals to be reviewed, the quality of those submittals, and the number of resubmittals <br />required. <br />The level of effort for this task is based on an assumption of seventy-five (75) submittals and thirty-five (35) re -submittals, <br />with an average level of effort of approximately four (4) hours per submittal for the initial submittal and two (2) hours for <br />the resubmittals. The total allowance for reviewing submittals is 370 labor -hours. <br />Task 9.3. RFIs <br />Contractor -generated Requests for Information (RFIs) will be submitted to the City's Construction Manager (CM). The <br />team will review and respond to RFIs submitted to it by the City's CM. Although the time required to respond to a particular <br />request for clarification varies greatly, the estimated level of effort for this task assumes fifty (50) RFIs at three (3) hours <br />each for a total of 150 labor -hours. <br />Task 9.4. On-site Construction Observation <br />Throughout the duration of construction, the Consultant will perform site inspections of the improvements. It is assumed <br />that a total of twelve (12) inspections will be performed. Two (2) inspections of the pump station and building expansion <br />will be performed by the structural and mechanical team members, four (4) inspections for the electrical and <br />instrumentation components by the electrical team and approximately six (6) inspections from the civil team to inspect <br />the diversion structure, rubber dam, pretreatment device, underground storage, and all other areas not covered by the <br />structural, mechanical and electrical team members. A total of 40 labor -hours including travel time and office time to <br />summarize inspection observations in memorandum form has been budgeted. <br />Following completion of construction, Consultant will perform final inspections of the completed or nearly completed site <br />and infrastructure. The Consultant will advise the City as to the acceptability of the work. Consultant team members from <br />each design discipline will perform the inspections. A total of 52 labor -hours including travel time and office time to <br />summarize inspection observations in memorandum form has been budgeted. <br />Assumptions for construction support: <br />• As-builts not included <br />• Final Commissioning not included <br />• Operations and Maintenance Manual not included <br />• Weekly meeting attendance (in person or via phone) not included <br />ATTY/AGR.2020.309/Craftwater Inc (Page 30 of 34) <br />