James O’Connell <br />Red Morton Community Park Regional Stormwater Capture Project, Redwood City, CA – Phase 2A <br />10 June 14, 2021 <br />Task 9 Sewer Outflow Design (OPTIONAL) <br />This optional task is being proposed to explore the possibility of outflowing a portion of the treated stormwater <br />to the existing 21” sanitary sewer in Roosevelt Ave. An outflow to the sanitary sewer was not included in the <br />original concept design and requires additional design and survey effort. <br />9.1 Survey <br />The survey limits will be expanded to include the parking lot on the east side of the park property and portions <br />of Roosevelt Ave. See Attached Figure. <br />The topographic survey will be comprised of a ground survey and aerial photogrammetry. The photogrammetry <br />information obtained as part of the original project boundary flight also included the expanded survey area, <br />therefore additional aerial survey is not required. However, processing of the information into CAD will be <br />required and is included in this scope. <br />One additional day of topographic ground survey and detailed investigations of the site will be performed to <br />allow the design team to understand above ground and potentially subsurface constraints that may limit the <br />sewer pipe route. These items may include, but are not limited to, tree canopies, above ground infrastructure, <br />storm drain invert elevations, street centerlines, sidewalks and existing utilities, fences, and park amenities. <br />Field survey will include invert elevation, pipe diameter and direction of flow for underground utilities, tree <br />trunk location and size, fences, and surface characteristics, hardscapes, vegetation, and above ground <br />structures. <br />The AutoCAD topographic map provided as part of the concept study phase, will be expanded to include this <br />new area. The survey will be used as a base map for the development of the Preliminary Design Documents and <br />the future detailed design phase. We will review the record utility information received to date for the project <br />and reach out to utility companies for additional information as needed. Utility as-builts will be incorporated <br />horizontally and vertically into the CAD base map. <br />Deliverable: <br />Expanded Topographic base map in AutoCAD. <br />9.2 Design <br />We will show the proposed sanitary sewer outflow pipe on 3 additional sheets. We will show the impacts to the <br />parking lot and roadway that the pipe will have and show the proposed pipe profile. We will develop the plans <br />to the 30% overall level. Outline specifications and cost estimates will be prepared. These additional sheets will <br />be added to the rest of the 30% design plans and be included in the sheet numbers and index. The title block <br />and formatting will be consistent with the remainder of the plan set. <br />Deliverable: <br />Additional sheets to be incorporated into 30% Design plan set. <br />9.3 Sanitation District Meetings <br />Engaging with the local Sanitation District is crucial to the success of this project. Craftwater will prepare meeting <br />documents and attend up to 2 meetings. For the sake of cost saving, we anticipate these meetings will be virtual. <br />It is assumed that the meetings will be set up by the City’s Project Manager. <br />ATTY/AGR.2021/Amend No. 1/Craftwater Inc (Page 13 of 16)