James O’Connell <br />Red Morton Community Park Regional Stormwater Capture Project, Redwood City, CA – Phase 2A <br />11 June 14, 2021 <br />Key data and decision factors that may help inform sanitation district representatives include preliminary analysis <br />of sewer system capacity and conceptual project impacts to plant peaking factor, potential impacts of sediment <br />and emerging priority pollutants such as PFAS to treatment system efficacy, and potential long-term operations <br />and maintenance costs associated with increased sediment and/or pollutant loading to key plant treatment <br />processes. <br />Deliverable: <br />Meeting materials (handouts, agendas, presentation content, meeting minutes, comment forms/input <br />exercise materials) for up to 2 meetings, totaling up to 4 hours of meeting time <br />9.4 Sewer Discharge Analysis <br />After discussions with the Sanitation District, additional modeling effort is required to understand the impacts <br />that prescribed discharge windows and capacity constraints have on the BMP system performance. Craftwater <br />Engineering will develop the sewer discharge model that addresses the information requirements from the <br />Sanitation District. The model will simulate long-term stormwater runoff capture from the Jefferson Branch <br />Drain which would be subsequently filtered, stored in the reservoir, and discharged to the Drain or to the <br />sanitary sewer. The model constraints will incorporate the peak and off-peak sewer capacity constraints <br />established by the Sanitation Districts. <br />Deliverable <br />Red Morton Park SW Project Sewer Discharge Analysis Table <br />ATTY/AGR.2021/Amend No. 1/Craftwater Inc (Page 14 of 16)