My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Craftwater
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Agmt21 Craftwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 2:30:53 PM
Creation date
2/12/2021 8:07:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Craftwater
PROJECT NAME
Design Professional Services
RMP File Number
304
Date
2/11/2021
MO Ref
21-008, 21-142
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
James O’Connell <br />Red Morton Community Park Regional Stormwater Capture Project, Redwood City, CA – Phase 2B <br />1 September 2, 2022 <br />ATTACHMENT A. SCOPE OF WORK <br />Craftwater Engineering has assembled a project team of leaders and experts in regional stormwater capture <br />analysis and design for the Final Design Development for a Regional Stormwater Capture Project at Red Morton <br />Community Park in Redwood City, CA. The final deliverables are intended to be used for construction of the <br />project. <br />The following provides our technical approach to fulfill the specific needs of this project. <br />Task 5. CEQA Analysis <br />Task to be confirmed in writing by City Engineer prior to start. <br />Task 5.5. Finalize and Publish Public Draft IS/MND <br />Following receipt of all team comments on the Administrative Draft IS/MND, the Consultant will address team <br />comments, revise the administrative draft document, and prepare a Public Draft IS/MND for public distribution <br />and review. Consultant will also prepare the necessary CEQA notices for the project, including the Notice of Intent <br />(NOI) to Adopt a MND, a separate newspaper or other public notice (if needed), and the State Clearinghouse’s <br />Notice of Completion (NOC) and Environmental Document Transmittal form. The City may be able to use the NOI <br />to fulfill the public noticing requirements of CEQA Guidelines Section 15072, which require the City to submit the <br />NOI to the County Clerk, mail the NOI to any entity that has requested the notice, and provide additional noticing <br />through one of the following procedures: <br />Publication at least one time by the public agency in a newspaper of general circulation in the area <br />affected by the proposed project: or <br />Posting of notices by the public agency on and off the site in the area where the project is to be located; <br />or <br />Direct mailing to the owners and occupants of property contiguous to the parcel or parcels on which the <br />project is located. <br />We will work with the City to distribute the IS and ND/MND to an appropriate mailing list of agencies, <br />organizations, and other interested individuals for review and comment. We will upload the IS/MND and all <br />necessary CEQA notices to the State Clearinghouse. The distribution of notices to the State Clearinghouse and <br />publication of the IS/MND starts a 30-day public review period for the IS/MND. <br />To complete the scope of work within he identified budget and schedule estimates, we have assumed: <br />The Public Draft IS/MND will be approximately 300 to 400 total pages in length (including any appendices) <br />and be delivered electronically to the City; <br />The Consultant will deliver the CEQA document to the State Clearinghouse via electronic means if <br />available and through regular transmittal if necessary; and <br />City staff will deliver the NOI to the County Clerk’s office, physically mail the NOI to surrounding properties <br />or post I on- and off-site, and complete any other CEQA noticing procedures (e.g., newspaper notice) or <br />IS/MND distribution tasks. <br />Task 5.6. Respond to Public Comments and Prepare Final CEQA Documents <br />Following receipt of all public comments made on the IS/MND, we will prepare an Administrative Final IS/MND <br />that incorporates any project changes made to the draft documents (as a result of public comments or new <br />ATTY/AGR.2022/Amend. No. 2/Craftwater Inc (Red Morton Stormwater Capture) (Page 4 of 10)
The URL can be used to link to this page
Your browser does not support the video tag.