James O’Connell <br />Red Morton Community Park Regional Stormwater Capture Project, Redwood City, CA – Phase 2B <br />3 September 2, 2022 <br />Administrative Final and Public Final IS/MND with written responses to comments and NOD <br />Task 6. 60% Project Design <br />Task 6.2. 60% PS&E <br />For the 60% design submittal, the project team will develop plans to the 60% level overall. Approximately 90% of <br />the civil design drawings will be developed to some degree and many will be nearly complete. Specifications and <br />cost estimates will be prepared. <br />The 60% submittal will mostly consist of plan sheets to provide more detail than was originally included in the <br />Preliminary Design Concept Report, and address comments from Redwood City. The structural, mechanical and <br />electrical design features will be included at this design level to verify pump station sizing, piping layout and initial <br />consultation with Pacific Gas and Electric Company (PGE). The Stormwater Harvesting system and building will also be <br />further defined. <br />The cost estimate from the 30% Design will be updated. <br />Hard copies and digital electronic files of 60% Plans, specifications, and Cost Estimate will be submitted. <br />It is assumed that a 60% Design Workshop will be convened at a location to be named by the City, with the <br />availability of teleconferencing the supporting design team, approximately two (2) weeks following receipt of the <br />60% Design Submittal. A review comment matrix will be prepared to capture review comments and responses of <br />all comments. The responses will be meaningful and descriptive enough to allow for the City Project Manager to <br />fully understand the nature of the comment and how the comment was closed. <br />The team will support the City with any presentations relevant to the City Commission and/or Council. <br />Deliverables: <br />60% Design PS&E Documents <br />60% Design Workshop <br />Task 6.3. 90% PS&E <br />For the 90% design submittal, the team will develop plans with all elements shown and checked within disciplines. <br />All specification sections will be drafted and checked by the discipline lead checker. 60% City review comments <br />agreed upon will be incorporated. Prior to submission, an internal QA/QC review will be conducted. <br />Hardcopies and digital electronic files of 90% plans, specifications, and cost estimate will be submitted. <br />A 90% virtual Design Workshop will be convened approximately two (2) weeks following receipt of the 90% Design <br />Submittal. A review comment matrix will be compiled, as described above. <br />The team will support the City with any presentations relevant to a City Commission and/or Council. <br />Task 6.4. Final PS&E <br />For the 100% (final) design submittal, the project team will incorporate review comments from the City and from <br />the interdisciplinary check, QA/QC review, constructability review, and provide a complete set of plans and <br />specifications suitable for the bid phase of the project. Drawings will conform to the Redwood City Standards and <br />ATTY/AGR.2022/Amend. No. 2/Craftwater Inc (Red Morton Stormwater Capture) (Page 6 of 10)