Exhibit "A" <br />Change Order No. 2 <br />CITY OF REDWOOD CITY, CALIFORNIA <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />ENGINEERING & TRANSPORTATION <br />Sheet: 1 of <br />Date: February 8th, 2021 <br />Project: Marshall Street Intersection Improvements at <br />Jefferson Avenue and Middlefield Road <br />Contractor: Seton Pacific Construction <br />CHANGE ORDER NO: <br />PURCHASE ORDER NO: <br />ACCT. NO: <br />2 <br />51226 <br />264-85085 <br />Original Contract Amount: $398,805.00 <br />Previous Change Orders: $7,499.00 <br />This Change Order: <br />264-85085 <br />$71,893.14 <br />Accumulative Total: $478,197.14 <br />You are hereby directed to make the herein described changes from the plans and specifications or do the following described <br />work not included in the plans and specifications of this contract. All new work herein described shall be done in accordance <br />with the applicable provisions of the plans and specifications, except as specifically modified by this contract change order. <br />NOTE: This change order is not effective until approved by the City. This change order includes all costs and time required to <br />complete the additional work described herein and the contractor shall be entitled to no other compensation. <br />DESCRIPTION OF CHANGE COST <br />At the intersection of Jefferson Avenue and Marshall Street: <br />With the exception of asphalt concrete, the contractor shall provide all labor, <br />equipment, material, and incidentals to reconstruct the intersection of Marshall <br />Street and Jefferson Avenue, complete in place for a lump sum cost of <br />$222,223.14. The contractor's scope of work explicitly includes but is not limited <br />to the following: <br />a. The contractor shall be responsible for all traffic control associated with <br />this work <br />b. The contractor shall be responsible for lowering the lids/rims of all utilities <br />within the work area to grades shown on the project plans <br />c. The contractor shall be responsible for sawcutting, demolishing, off <br />hauling, and dumping the existing pavement as needed to meet the <br />grades specified by on Sheet 6 of the project plans while providing a <br />minimum 9" thick asphalt concrete section within the intersection <br />d. The City will be purchasing the asphalt concrete from Granite Rock <br />e. The contractor shall be responsible for installing a 9" thick deeplift of <br />asphalt concrete within the limits of work shown on the project plans, <br />complete in place <br />f. The contractor shall be responsible for completing all remaining traffic <br />signal modification work as shown on the project plans and project <br />specification <br />g. The contractor shall be responsible for completing all signing and striping <br />work as shown on the project plans and project specification <br />h. The field modified striping changes <br />$222,223.14 <br />The following bid items are delted from the project at the bid price: <br />a. Bid item #1, Mobilization, Notification, and Incidentals, 0.1 LS, <br />$55,000.00/1-S <br />($5,500.00) <br />b. Bid item #2, Water Pollution Control Program, 0.25 LS, $10,000.00/1-S <br />($2,500.00) <br />c. Bid item #3, Traffic Control, 0.2 LS, $25,000.00/1-S <br />($5,000.00) <br />d. Bid Item #6, Cold Plane Asphalt Concrete Pavement, 7665 SQFT, <br />$2.00/SQFT <br />($15,330.00) <br />e. Bid Item #9, Remove Drainage Inlet, 1 EA, $500.00 EA <br />($500.00) <br />f. Bid Item #10, Hot Mix Asphalt, 100 TON, $360.00/TON <br />($36,000.00) <br />g. Bid Item #15, Curb Inlet D-1, 1 EA, $5,000.00 EA <br />($5,000.00) <br />h. Bid Item #16, Adjust Utility Rims to Grade, 8 EA, $250.00 EA <br />($2,000.00) <br />i. Bid item #17, Traffic Signal Modification (Jefferson and Marshall), 0.6 LS, <br />$65,000.00/1-S <br />($39,000.00) <br />