Laserfiche WebLink
j. Bid item #18, Signing and Striping, 1 LS, $37,000.00/LS ($37,000.00) <br />k. Add alternate #1, Signal interconnect, 0.1 LS, $25,000/1-S ($2,500.00) <br />TOTAL $71,893.14 <br />JUSTIFICATION <br />1. Thickness of asphalt pavement section is different from the section indicated on Sheet 6 of the project plans. <br />2. The time contractor spent evaluating and coming up with proposed solution to reconstruct the intersection <br />3. The time contractor spent scheduling and coordinating the work <br />Submitted By: Title: Project Engineer Date: 02/08/21 <br />Approval Recommended: Title: Project Manager Date: 02/08/21 <br />We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree. If this change <br />order is approved, we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all <br />services necessary for the work above specified, and will accept as full payment therefor the prices shown above. <br />Accepted by: <br />Title <br />Contractor: <br />Date <br />City Approval: <br />Date <br />CDT Director <br />Date <br />City Manager <br />Date <br />