Laserfiche WebLink
<br />78 <br />approval was not considered final; rather it was contingent upon other necessary Page 6 <br />jurisdiction/agency approvals.1 Nevertheless, as previously described, the College <br />District has since withdrawn their PO application with the City and has submitted a <br />new/revised PO application to the Planning Commission for consideration at a date yet <br />to be determined. The Woodhiill Estates appeal of the previous PO permit approval is <br />thus no longer relevant. <br /> <br />CEQA Appeal: <br />Woodhill Estates, through their legal counsel Miller Starr Regalia, also contends that a <br />subsequent Mitigated Negative Declaration (MND) or environmental impact report (EIR) <br />should have been prepared for the project because the MND prepared by the District <br />and the Addendum prepared by the City do not adequately identify or analyze all the <br />land use and planning impacts of the project (Le. privacy, aesthetics/views, noise, safety <br />and traffic) with respect to the approvals that must be granted by Redwood City <br />(General Plan Amendment, Prezoning and entitlements) for the project. <br /> <br />On September 26, 2007, the College District Board of Trustees, acting as the Lead <br />Agency, adopted the Initial Study/Mitigated Negative Declaration (MND) and approved <br />the project. With implementation of the mitigation measures identified in the MND, it was <br />determined that all identified impacts would be reduced to less than significant. <br /> <br />On November 16, 2007, Planning staff also prepared an Addendum to the MND to <br />provide clarifying information in the MND related to Redwood City's General Plan Land <br />Use Designation for the site and the precise location of the CitylTown jurisdictional <br />boundary. The Addendum provides the corrected technical data, but does not result in <br />any new conclusions about project impacts or mitigation measures (i.e. the corrected <br />information does not result in new significant environmental impacts nor increase the <br />severity of previously identified environmental impacts). <br /> <br />On November 27, 2007, the Planning Commission considered the Initial Study/MND, <br />and Technical Addendum prior to making their recommendation to Council to approve <br />the General Plan Amendment, prezoning and annexation. The Initial Study/MND and <br />Addendum, previously provided to the City Council, were prepared in accordance with <br />CEQA Guidelines Sections 15162 and 15164. <br /> <br />ALTERNATIVES <br />1. Do not deny the appeal and revoke the previously approved Planned <br />Development Permit. <br />2. Do not approve the General Plan designation, Pre-zoning, Property Tax <br />Exchange and RHNA housing unit exchange agreement with the Town of <br />Woodside. <br /> <br />1 Redwood City City Council approval of the project site's General Plan designation, Prezoning and <br />property tax exchange; the Town of Woodside's Property Tax Exchange; and LAFCO property <br />annexation. <br />4/24/08 <br />