Laserfiche WebLink
<br />Mr. Chu Chang <br />March 7, 2008 <br />Page 3 <br /> <br />Task I. Compile and Review Data <br />Obtain the C/CAG Emme Model <br />Review 2005 C/CAG Model Network and T AZ Boundary <br />Review 2035 C/CAG Model Network and T AZ Boundary <br />Review 2005 C/CAG Model Land Use Data <br />Review 2035 C/CAG Model land Use Data <br />Obtain land Use Data from the City <br />Compare the land Use Data <br />Compile Intersection Information including Recent Counts (2006 or later) <br />Obtain the GIS file in T AZ boundary <br />Obtain Aerial photos <br />Obtain Speed Information <br /> <br />Task 2. Update the Networks <br />Determine the Intersection Locations: Existing Year <br />Determine the intersection turning movements: Existing Year <br />Determine the road attributes (lanes. distances, classes, FFS): Existing Year <br />Determine the road attributes (lanes, distances, classes, FFS): Year 2035 <br />Determine the New T AZs <br />Transfer City's existing parcel data into the City's T AZ.based data <br />Establish the Relationship between C/CAG's T AZ and the City's T AZ <br />Determine the Special Generators <br />Create the New T AZ Boundaries <br />Determine the existing land use data for the model <br />Determine the future land use data for the model <br />Match the Model Network to the GIS Coordinates <br /> <br />Task 3. Model Calibration for Existing Year <br />Define the Modeling Subarea <br />Create Emme bank <br />Enter traffic counts <br />Revise the network and Its attributes <br />Calibrate the Model <br />Report the Results In Figures <br /> <br />Task 4. Demand Forecasting (2035) <br />Determine Future Study Area Networks <br />Review the T AZ connectors <br />Read into Emme <br />Forecast traffic volumes for future years <br />Review the volumes <br />Review and Compare the Results <br />Prepare the outputs (link and turn volumes) <br />Forecast Six Alternatives <br />Report Results in Figures (link and turn volumes) <br /> <br />Task 5. Create Special Generators <br />Prepare the land Use Data for the up to Five Generators <br />Determine the ITE rates <br />Create the Special Generators in Macro <br />