6.1 F <br /> Page 2 <br /> 5. Custamer site retrof�ts for each existing private or public si#e with a landscape <br /> irrigation meter. Retro�ts will occur as each property owner agrees to convert to <br /> recycled water for landscape irrigation and industrial uses. <br /> Status: Retrofit Bid Package 1 (18 commercial sites in the Redwood Shores area) <br /> was 10Q% canstructed for the 2007 irrigation season. Retrofit Bid Package 2 wil! be <br /> avaiiable for bidding in May 2008. <br /> Bid Package 7 (see attached map) is the seventh distribution pipeline construction <br /> project and is part of the delivery system of recycled water to fihe Seaport area. The <br /> proposed Bid Package 7 continues the construction of the main transmission piping <br /> system along Seaport Boulevard that began in Bid Packages 5 and 6 at Blomquist <br /> Street. Piping wiil also be irrstalled along East Bayshore Road and connec#ions made <br /> to the comp{eted Bikepath Pipeline and Bid Package 4 projects. More than 3,7001inear <br /> feet of 24-inch diameter PVC pipe will be cons#ructed in approximately six months. <br /> Campletion of the proposed work and one short link of transmission piping from Bid <br /> Package 8 wi8 allow delivery of recycled water to the Seaport area. <br /> The 7 bids received at the bid opening on Aprit 16, 2008, are summarized befaw: <br /> No. Bidder Bid Amount <br /> 'I. Shaw Pi line Inc. $ 2,Q62,250.04 <br /> 2. J&M lnc. $2,146,834.00 <br /> 3. KJ Woods Canstruction Inc. $ 2,244,000.00 <br /> 4. Delta Excavatin Inc. $ 2,309,390.00 <br /> 5. Pacific Under round Construcfion Inc. $2,537,740.00 <br /> 6. McGuire Hester $ 2,599,$70.00 <br /> 7. Con-Quest Contractors Inc. $ 2,950,865.00 <br /> The Iow bid of$2,062,250.00 from Shaw Pipeline, Inc. is 6% lower than the engineer's <br /> estimate o# $2.20 miltion #ar the oast of construction. Based upon the bids received, <br /> staff believes #hat the low bid of $2,062,250.00 is �easonable and responsive, and <br /> recommends awarding the cantract to Shaw Pipeline, lnc. <br /> ALTERNATiVE5 <br /> Council may choose not to award the contract for the Redwood City Recycled Water <br /> Project -- Phase I — Seaport Disfiribution System — Bid Package 7 (Bike Path, East <br /> Bayshore Raad, Mapte Street, Blomquist Street, and Seaport Boulevard} Project, which <br /> would be contrary to prior Council action. <br /> F{SCAL IMPACT <br /> Funds for fhe proposed construction contract are available from the Water Revenue <br /> Bond proceeds. The City has issued a series of three Water Revenue Bonds to finance <br /> Phase 1 of the Recycled Water Project. Available project funds, iess u�attributed <br /> interest, tota! $12,623,130.06 as of March 31, 24Q8. Up #0 25% of eligible construction <br /> costs of Bid Packages 5 through 9 may be reimbursed by the State's Proposition 13 <br /> Water Recyc(ing Grant Program. <br />