My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-05-19 Spec
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-05-19 Spec
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2008 10:59:57 AM
Creation date
5/15/2008 4:40:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
5/19/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.1E <br />Page 2 <br /> <br />5. Customer site retrofits for each existing private or public site with a landscape <br />irrigation meter. Retrofits will occur as each property owner agrees to convert to <br />recycled water for landscape irrigation and industrial uses. <br />Status: Retrofit Bid Package 1 (18 commercial sites in the Redwood Shores area) <br />was 100% constructed in time to meet the demands of the 2007 irrigation season. <br />Retrofit Bid Package 2 is scheduled for completion in time to meet the demands of <br />the 2008 irrigation season. <br /> <br />The proposed customer site retrofit project is the second retrofit project designed to <br />expand the delivery of recycled water to new commercial irrigation and City roadway <br />landscape customers in Redwood Shores. The project consists of converting an <br />additional 41 existing irrigation systems from 17 sites, currently on drinking water, to <br />accommodate the use of recycled water. The construction is expected to be completed <br />in approximately 150 days from the Notice to Proceed, <br /> <br />Please see attached map for specific locations of various retrofit project phases. <br /> <br />The 4 bids received at the bid opening on May 7, 2008, are summarized below: <br /> <br />Bidder Bid Amount <br />Trinet Construction, Inc.. San Francisco $372,095.00 <br />Pacific Undemround Construction, Inc., San Jose $379,000.00 <br />West Vallev Construction Companv, Inc" San Jose $487,135.00 <br />P & J Utilitv Comoanv, San Francisco $550,000.00 <br />Erldklee....s Estim~te . . $j45,o.O<l.Od, <br />Recommended Bidder: Trinet Construction, Inc. <br />Substantiation: Trinet Construction, Inc. is the lowest responsive and responsible bidder. <br /> <br />The low bid of $372,095.00 from Trinet Construction, Inc. is 7.9% higher than the <br />Engineer's estimate of $345,000.00 for the cost of construction, Based upon the bids <br />received, staff believes that the low bid of $372,095.00 is reasonable and responsive, <br />and recommends awarding the contract to Trinet Construction, Inc. <br /> <br />AL TERNA TlVES <br />Council may choose not to award the contract for the Redwood City Recycled Water <br />Project - Phase I - Redwood Shores Customer Site Retrofits - Bid Package 2 Project, <br />which would be contrary to prior Council action. <br /> <br />FISCAL IMPACT <br />Funds for the proposed construction contract are available from the Water Revenue <br />Bond proceeds. The City has issued a series of three Water Revenue Bonds to finance <br />Phase 1 of the Recycled Water Project. Currently available project funds, less <br />unattributed interest, total $12,623,130.06. <br />
The URL can be used to link to this page
Your browser does not support the video tag.