My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Covello Group, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 Covello Group, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 2:59:02 PM
Creation date
5/29/2008 4:53:48 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Covello Group
PROJECT NAME
Lakeveiw Pump Station Improvement Project
Date
5/27/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment 2 <br /> Construction Management Services <br /> Lakeview Pump Station <br /> City of Redwood City <br /> b. Maintain a log and tracking system for submittals. Track <br /> the status of submittal review with the DC and the status of <br /> shopdrawing resubmittals with the Contractor. <br /> 5. Requests for Information (RFI's) <br /> a. Maintain a system for logging and tracking RFI's. Track the <br /> status of RFI review with the DC. <br /> 6. Clarification Letters (CL) <br /> a. Maintain a system for logging and tracking CLs. <br /> 7. Field Orders (FO) and Field Directives (FD) <br /> a. Maintain a system for logging and tracking FOs and FDs. <br /> 8. Change Order Preparation <br /> a. Maintain a system for logging and tracking changes. <br /> 9. Progress Payments <br /> a. Verify the quantity and acceptability of stored materials. <br /> b. Verify the Contractor's construction progress as it relates <br /> to the progress payments. <br /> c. Provide recommendations for payment to Redwood City. <br /> III. Special Inspections, Testing <br /> A. Schedule and coordinate special inspections, materials testing. <br /> B. Redwood City will contract for all special services including: <br /> a. Hazardous materials inspections, testing or consultations. <br /> b. Concrete quality control and testing <br /> c. Soils testing <br /> d. Geotechnical services <br /> C. Redwood City will contract for all other design related services. <br /> III. Project Closeout <br /> A. The Contractor will furnish record documents, which Covello will turn over <br /> to DC for conforming and final issuance to Redwood City. <br /> B. The Contractor will furnish system Operation & Maintenance Manuals. <br /> C. Final Inspection and Punch List <br /> 1. Redwood City will participate and provide input on final <br /> inspection. <br /> 2. DC will provide design input on final inspection items. <br /> a. Covello will prepare and issue the punchlist with input from <br /> Redwood City. <br /> b. Covello and Redwood City will verify jointly that the <br /> punchlist work has been completed. <br /> IV. Warranty Coordination <br /> A. Maintain a Warranty File <br /> B. Redwood City will coordinate warranty work after the start of the warranty <br /> period. <br /> April 28,2008 Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.