Laserfiche WebLink
<br />CLIENT: City of Redwood City <br />PROJECT: Hoover Park <br />Project # 0802400-0057 <br /> <br />Verde Design, Inc. <br />Date: 5/9/08 <br />PREP. BY: Devin Conway <br /> <br />E. Construction Administration <br />1 answer turf manufacturer's questions $0.00 4.0 $460.00 2.0 $340.00 $800.00 <br />2 submittals, substitutions, etc. $0.00 16.0 $1,640.00 2.0 $340.00 $2,180.00 <br />3 Construction mtgs (6) $0.00 36.0 $4,140.00 4.0 $880.00 $4,820.00 <br />4 Respond to Contractor Questions $0.00 20.0 $2,300.00 4.0 $680.00 $2,980.00 <br />5 Final Walk through and punch list $0.00 11.0 $1,265.00 4.0 $680.00 $1,945.00 <br />6 Record Drawings $0.00 8.0 $920.00 1.0 $170.00 $1,090.00 <br />7 Project Close-Out $0.00 4.0 $460.00 1.0 $170.00 $630.00 <br />8 project admin. $0.00 4.0 $460.00 4.0 $680.00 $1,140.00 <br /> Total Fees, Phase E. 0.0 $0.00 103.0 $11,845.00 22.0 $3,740.00 $15,585.00 <br /> <br />#REFI <br /> <br />#REFI <br /> <br />#REFI <br /> <br />FEE TOTAL <br /> <br />$59,905.00 I <br /> <br />J:\Proposals\Sports\P05\Hoover Park fee spreadsheet 050908 <br /> <br />Page 2 <br />