My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 RMC Water and Environment
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 RMC Water and Environment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2010 2:56:55 PM
Creation date
7/9/2008 10:57:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RMC Water and Environment of San Jose
PROJECT NAME
Apree for Glenwood Pump Station
RMP File Number
304
Date
7/1/2008
MO Ref
08-073, 09-245
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Meeting agendas and minutes <br /> <br />Task 2 - Surveying and Utilities Research <br /> <br />RMC will obtain utility information from the City and private utilities. It is assumed that <br />the City will make available all utility data for City-owned infrastructure (water, <br />wastewater, landscaping, communications), and that private utilities will include PG&E <br />(gas and electricity), as well as local cable and telecommunications providers. RMC will <br />review this information to obtain approximate locations of utility conflicts within the <br />project area. <br /> <br />No surveying or potholing are included in this Scope of Services. It is assumed that the <br />City will provide surveying and topographic mapping (AutoCAD format), and that this <br />survey data will accurately record the location of all above ground surface features, <br />structures and utilities. RMC does not foresee a need to pothole for existing subsurface <br />utilities. <br /> <br />Deliverables: <br />. Utility basemap (Auto CAD), using City-provided topographic map as a base, for <br />the project site <br /> <br />Task 3 - Preliminary Design (30% Design Submittal) <br /> <br />The goal of this task is to develop and evaluate the conceptual design alternatives, <br />developing consensus with City staff for the recommend project components to be carried <br />forward into detailed design. These aItemative will be based on a full understanding of <br />the history ofthe Glenwood Pump Station as well as the CUll'ent configuration and <br />condition of the station. A hydraulic analysis will also be completed to assess the <br />station's ability to meet the City's short-term and 10ng-telID operational goals. <br /> <br />Subtask 3.1 - Revielv Existing Information <br />RMC will review existing information regarding the pump station (construction <br />documents, operational data, maintenance history, distribution system maps) to build a <br />firm understanding of the pump station's operation as it relates to the water system as a <br />whole. <br /> <br />RMC will hold a workshop with City staff, followed by a site visit to the pump station <br />site (and other sites, as appropriate). The goal of the meeting and site visit will be to <br />obtain information regarding issues with the pump station, obtain operator input <br />regarding the objectives for the proposed improvements, and to assess the condition of <br />equipment and piping associated with the station. <br />
The URL can be used to link to this page
Your browser does not support the video tag.