Laserfiche WebLink
<br />FISCAL IMPACT <br />Funds for the roadway resurfacing work are available from the Water Bond Projects <br />Fund - Recycled Water System Development which has a currently available balance <br />of $5,962,006. Funds for the work related to the proposed re-striping to reconfigure the <br />roadway, estimated at $100,000, are available from the Traffic Mitigation Fees Fund _ <br />Bicycle/Pedestrian Enhancement Program which has a currently available balance of <br />$50,000 and the Traffic Calming Program which has a currently available balance of <br />$326,954. <br /> <br />7C <br />Page 4 <br /> <br />~~~~~.~ <br />Saber Sarwary, P.E. <br />Seni r Civil ngineer <br /> <br /> <br /> <br />Peter Ingram <br />City Manager <br /> <br /> <br />ATTACHMENTS <br />1. Proposed lane configuration modifications for Marine Parkway <br />2. Proposed lane configuration modifications for Twin Dolphin Drive <br />3. Proposed lane configuration modifications for Redwood Shores Parkway <br /> <br />RELATED DOCUMENTS IN CITY CLERK'S OFFICE <br />1. Contract Documents <br />2. Bid Documents <br />