My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-08-11 Clsd and Reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-08-11 Clsd and Reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2008 4:45:18 PM
Creation date
8/7/2008 3:24:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
8/11/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C. Agreement with Wagstaff and Associates for Environmental Consulting Services <br />for the Stanford University Project. <br /> <br />Staff contact: Maureen Riordan, Senior Planner 780-7236 mriordan@redwoodcity.org <br /> <br />Recommendation: <br />Approve an agreement for environmental consulting services with Wagstaff and <br />Associates for preparation of the "Stanford in Redwood City" Environmental Impact <br />Report (EIR). <br /> <br />D. Award of Contract - Redwood City Recycled Water Project - Phase I - Redwood <br />Shores Distribution System - Bid Package 9 (Island Drive and Bridge Parkway in <br />the Westport Office Park). <br /> <br />Staff contact: Phong DUt P.E, Senior Civil Engineer 780-7385 pdu@redwoodcity.org <br /> <br />Recommendation: <br />Approve, by motion, the contract documents and award the contract for the <br />Redwood City Recycled Water Project - Phase 1 - Redwood Shores Distribution <br />System - Bid Package 9 Project to the lowest responsible bidder, Shaw Pipeline, <br />Inc. of San Francisco, for their responsive and responsible low bid of <br />$1,252,650.00 and authorize the City Manager to increase the contract amount up <br />to 10% if necessary. <br /> <br />E. Consulting civil engineering services for the design phase of the EI Camino Real <br />"Grand Boulevard" Streetscaping Project - Broadway to Brewster Avenue. - Ciw <br />CounciVRedeve/olJment Agencv Board. <br /> <br />Staff contact: M. Saber Sarwary, P.E, Senior Civil Engineer 780-7370 ssarwary@redwoodcity.org <br /> <br />Recommendation: <br />Approve, by motion, a professional services agreement with T.Y. Un International, <br />Inc. of San Ramon to provide consulting civil engineering services for the design <br />phase of the EI Camino Real "Grand Boulevard" Streetscaping Project not to <br />exceed $308,728.00. <br /> <br />F. Construction Improvement Agreement and Revocable Encroachment Permit - <br />579 California Way. <br /> <br />Staff contact: Jon K. Lynch, P.E, City Engineer 780-7371 jlynch@redwoodcity.org <br /> <br />Recommendation: <br />Approve and authorize, by motion, <br />1. An agreement between the City and George Bechwati for proposed <br />construction improvements at 579 California Way, and <br />2. a revocable encroachment permit for work proposed within the public right of <br />way at the same address <br /> <br />JOINT CITY COUNClllREDEVELOPMENT AGENCY BOARD MEETING <br />AGENDA <br /> <br />AUGUST 11, 2008 <br />PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.