Laserfiche WebLink
<br />EXHIBIT A: Scope of Work <br />AGREEMENT FOR MUSEUM EXHIBIT DESIGN AND FABRICATION SERVICES <br /> <br />Split Rock Studios <br />2071 Gateway Blvd. <br />Arden Hills, MN 55112 <br />800-433-9599 ext. 717 <br />651-631-2211 ext.717 <br />FAX: 651-631-0707 <br /> <br />PROJECT: Redwood Shores Library Interpretive Center <br />COST: $277,000 <br />COM PLETION DATE: September 1, 2008 <br /> <br />CONSULTANT: <br /> <br />Task Task and description <br />exhibit: Life in the Mud <br /> <br />Design <br />key <br /> <br />Cost <br /> <br />Timeline <br /> <br /> Mud Structure - Crescent-shaped mud structure is approximately 30' in <br />1 overall length and 4' to 5' wide and 7' high. It will represent the bottom of <br /> the slough. Structure will have two walkthrough areas. A.1 <br /> SRS material $11,419 <br /> SRS staff time: 720 hour $46,800 <br /> total Mud Structur $58,219 6/18-8/11/2008 <br /> Large Animal Sculptures - Eight oversized (100X life size average) animal <br /> sculptures that will hang from ceiling and mount to mud structure. <br />2 (Atlantic Soft Shell Clam, Amphipod, California Bat Ray, Cancer Crab, <br /> Nudibranch, Orange Anemone, Spaghetti Worm, Spider Crab, and Red A.1 <br /> Beard Sponge.) (a-h) <br /> SRS material $10,707 <br /> SRS staff time: 418 hour $27,170 <br /> total Large Animal Sculpture $37,877 6/18-7/21/2008 <br />3 Graphic Panel - (4' x 6') Interpretive Panel mounted on Mud A.2 <br />Structure. <br /> SRS material $872 <br /> SRS staff time: 17 hour $1,105 <br /> total "Mud" graphic pane I $1,977 6/18-8/1112008 <br />4 Graphic Panel (4' x 6') - "Lifecycle of the Bay Floor" A.3 <br /> SRS material $597 <br /> SRS staff time: 22 hour $1,430 <br /> total "Lifecycle" graphic pan I $2,027 6/18-8/1112008 <br /> Agitation Model- One 4" diameter x 24" long acrylic tube filled <br />5 with sediment and water to interpret agitation. It will mount to A.3.a <br /> Graohic Panel A.3. <br /> SRS material $116 <br /> SRS staff time: 4 hour $260 <br /> total Agitation mod I $376 6/18-6/27/2008 <br />6 Graphic Railing - A crescent-shaped reading rail to mount to A.4 <br />Mud Structure, Size is approximately 6' wide x 18" deep. <br /> SRS material $840 <br /> SRS staff time: 10 hour $650 <br /> total "Mud" graphic ra I $1,490 6/15-8/11/2007 <br />