My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Split Rock Studios
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Split Rock Studios
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2008 11:56:21 AM
Creation date
8/11/2008 11:56:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Split Rock Studios
PROJECT NAME
Museum Exhibit Design and Fabrication Services
RMP File Number
304
Date
6/17/2008
MO Ref
08-146
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7 Video Microscope - Video microscope and computer with LCD A.5 <br />screen will mount on Graphic Rail AA. <br /> SRS material $2,409 <br /> SRS staff time: 4 hour $260 <br /> total Video Microscop $2,669 6/23-8/11/2008 <br />8 Foam Footprint Interactive A.6 <br /> SRS material $240 <br /> SRS staff time: 18 hour $1,040 <br /> total Foam Footprir $1,280 6/18-8/01/2008 <br />9 Hanging Banners - Magnified Mud A.7 <br /> SRS material $1,702 <br /> SRS staff time: 32 hour $2,080 <br /> total Hanging Banner $3,782 6/18-8/11/2008 <br />10 Magnified Mud Touchscreen and structure A.8 <br /> SRS material $5,393 <br /> SRS staff time: 70 hour $4,550 <br /> total Magnified Mud Touchscree $9,943 6/18-8/11/2008 <br />11 Custom seating A.9 <br /> SRS material $229 <br /> SRS staff time: 14 hour $910 <br /> total Seatin\ $1,139 6/1 8-8/11/2008 <br /> <br />subtotal <br /> <br />$120,779 <br /> <br />exhibit: Life in the Water <br /> <br />12 300-gallon aquarium and equipment not provided by Split Rock 8.1 <br />13 Graphic Rail (48" x 15") - "The Water is Full of Life." Aquarium 8.2 <br /> SRS material~ $331 <br /> SRS staff time:19 hour $1 ,23~ <br /> total Aquarium Graphic Ra I $1,566 6/2318-8/11/2008 <br />14 Camouflage Interactive - Visitors will place cut-outs of fish in a small 8.3 <br />magnetic mural to learn how adaptive colaration by fish helps hem to <br /> SRS material $2,01 E <br /> SRS staff time: 40 hour $2,60C <br /> total Camouflag $4,618 6/18-8/20/2008 <br />15 Food Web Interactive - Using push buttons and lighting, visitors will learn 8.5 <br />about the food chain. <br /> SRS material $2,305 <br /> SRS staff time: 31 hour $2,015 <br /> total Food We $4,320 6/18-8/20/2008 <br /> <br />subtotal <br /> <br />$10,504 <br /> <br />exhibit: Interactive Map <br /> <br />16 42" LCD Plasma Screen and structure C.2 <br /> SRS material $3,909 <br /> SRS staff time: 61 hour $3,965 <br /> totalMap Touchscree $7,874 6/18-6/27 <br />17 Touchscreen Control- Will mount on Graphic Rail C.3 to interface C.1 <br /> SRS material $4,161 <br /> SRS staff time: 15 hour $97'i <br /> total Touchscreen Contre I $5,162 6/30-8/1/2008 <br />18 Graphic Rail (60" x 15") - "Drains Directly to Bay" C.3 <br /> SRS material $607 <br /> SRS staff time: 13 hour $845 <br /> total Map Graphic Ra I $1,452 6/18-8/11/2--8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.