My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 T.Y. Lin International
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 T.Y. Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2009 12:13:15 PM
Creation date
9/10/2008 10:05:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
T.Y. Lin International
PROJECT NAME
Consulting Civil Engineering Services
RMP File Number
405
Date
9/9/2008
MO Ref
MO 08-175
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />~.'J <br />WtlJiiOiiiiiii <br />~; <br /> <br />EI Camino Real "Grand Boulevard" Streetscaping Project <br /> <br /> <br />6.2 Pre-final, 100% PS&E) <br />The TYLI team will refine the preliminary plans <br />into a Final Design Plan. The final plan will <br />include descriptions/images describing <br />materials, style, color, and manufacturer of <br />selected hardscape treatments, site amenities, <br />and public gathering spaces. Presentation <br />materials will be prepared suitable for use at <br />Public Meeting #2 and subsequent public <br />presentations. We will also update the initial <br />construction cost estimate to reflect the Final <br />Preliminary Design Plans. The following <br />subtasks will be included. <br /> <br />6.2.1 Review Final Design Plans and Cost <br />summary with City Staff - The TYLI <br />team will meet with the City Staff to <br />review the Final Design Plans and <br />potential options. Following the meeting, <br />TYLI will incorporate staff comments <br />and prepare presentation material <br />suitable for use at the public meeting. <br /> <br />6.2.2 Public Meeting - The TYLI team will <br />work with City Staff to communicate to <br />the public the Final Design Plans. The <br />TYLI team envisions that at this <br />meeting, we will present the preferred <br />Final Design Plans, site furniture, color <br />palette, tree species, and material <br />options. We will facilitate the group to <br />gather any additional comments on the <br />preferred design components. <br /> <br />6.2.3 Prepare Specifications - The team will <br />prepare technical specifications for the <br />pre-final, 100% Plans. The <br />specifications will be in conformance <br />with Section 10 "Construction Details" <br />of The 2006 Caltrans Standard Special <br />Provisions. <br /> <br />6.2.4 Perform QAlQC - This will include <br />performing the TYLI internal QA/QC <br />review for all pre-final, 100% PS&E, <br />including those to be performed by <br />subconsultants. <br /> <br />Deliverables <br />. Three sets of I "=20' scale Improvements Plans <br />. Technical Specifications <br />. Pre-final, 100% construction cost <br /> <br />. Minutes of plan review meeting <br /> <br />6.3 Prepare Final PS&E, Bid ready <br />The TYLI team will prepare final plans, <br />specifications, and cost estimate. The <br />specifications will include technical <br />specification based on Section 10 "Construction <br />Details," of the Caltrans Standard Special <br />Provisions. TYLI will incorporate the City of <br />Redwood City front end specifications. The <br />team will also include City staff and Caltrans <br />100% review comments. <br /> <br />6.5.1 Attend meeting with the City and <br />Caltrans - The TYLI team will present <br />the Final PS&E to City Staff and <br />Caltrans and discuss comments received <br />from City Staff and Caltrans. Key <br />proceedings, decisions and issues will <br />be documented in meeting minutes. <br /> <br />6.5.2 Perform QAlQC - This will include <br />performing the TYLI internal QA/QC <br />review for all Final PS&E, including <br />those to be performed by subconsultants. <br /> <br />Deliverables <br />. One 24" x 34" signed sets of I "=20' scale <br />Improvements Plans <br />. One "camera-ready" Contract Document and <br />Technical Specifications, including appendices <br />. Final construction cost <br />. Minutes of plan review meeting <br />. Obtain Caltrans Encroachment Permit <br /> <br />ORGANIZATION CHART <br /> <br />The chart on the following page presents the TYLI <br />organization for conducting the work under this <br />contract and identifies task leaders for the principal <br />areas of work. All work will be under the direction of <br />Tom Wintch as Project Manager. He will serve as the <br />principal contact with the City Project Team and will <br />actively participate in all project meetings. As Project <br />Manager, he will directly oversee the work of the <br />TYLI task leaders and subconsultants, ensuring <br />conformance with technical, schedule, and budget <br />requirements. He will be proactive in his management <br />activities to ensure that the project work is completed <br />by the established deadline. <br /> <br />n'-LININTERNATIONAL <br /> <br />Page 9 <br />7YU 831023.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.