My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 T.Y. Lin International
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 T.Y. Lin International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2009 12:13:15 PM
Creation date
9/10/2008 10:05:21 AM
Metadata
Fields
Template:
Agreement
Contractor Name
T.Y. Lin International
PROJECT NAME
Consulting Civil Engineering Services
RMP File Number
405
Date
9/9/2008
MO Ref
MO 08-175
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fA <br />~...1.!!') <br />tCIIJ~ <br />~ <br /> <br />EI Camino Real "Grand Boulevard" Streetscaping Project <br /> <br /> <br />Task 4 - Research Existin$! Utilities and Utility <br />potholin$! <br /> <br />Utility companies will be contacted to request facility <br />maps needed and to assess whether any facilities will <br />be impacted by the project. Utility plans will be <br />developed from the facility maps and field survey, and <br />will be submitted to utility companies for verification. <br />The utility facilities will be positively located in <br />accordance to Caltrans Chapter 13.01.02.08 "Policy on <br />High and Low Risk Underground Facilities within <br />Highway Right of Way." <br /> <br />styles. These preliminary schematic design <br />materials will show the layout of the streetscape <br />improvements including landscaping, hardscape <br />treatments, street trees and grates, site furniture <br />amenities (benches, waste receptacles, bike <br />racks, newspaper stands, public drinking <br />fountains), and way-finding signage. Public <br />gathering spaces for outdoor seating and dining, <br />as well as areas for potential public art will also <br />be identified. A preliminary level construction <br />cost will be prepared as well. The following sub- <br />tasks will be included: <br /> <br />Deliverables <br />. Utility Letters <br />. Utility plans <br /> <br />Task 6 - Prepare Plans and Specifications <br /> <br />6.1 Preliminary design (35% PS&E) <br />The Preliminary layout will be developed using <br />the aerial topographic base mapping and will <br />show the proposed improvements including <br />median widening, bulb-outs, lane dimensions, <br />and striping. The layout will be consistent with <br />the design plan and cross section set forth in RFP <br />Exhibits 1 and 2. The plans will be supplemented <br />by cross sections, enlarged plans and <br />photographic images to communicate materials, <br />color, size, and form for the refined design. <br /> <br />6.1.1 Review Preliminary Plans, and Cost <br />summary with City Staff - The TYLI <br />team will meet with City Staff to review <br />the Preliminary Design Plans and <br />potential options. Following the meeting, <br />TYLI will incorporate staff comments <br />and prepare presentation material <br />suitable for use at the public meeting. <br /> <br />6.1.2 Public Meeting - The TYLI team will <br />work with City Staff to communicate to <br />the public the technical information and <br />economic feasibility about the project <br />and gather input on the Preliminary <br />Design plans. The TYLI team envisions <br />that at this meeting, we will present the <br />Preliminary Design Plans, three <br />alternative site furniture families, <br />optional color palettes, tree species, <br />material options. We will facilitate the <br />group consensus on the preferred design <br />components. <br /> <br />6.1.3 Perform Geotechnical analysis as <br />required by the project. This task will be <br />performed only after City authorization. <br /> <br />6.1.4 Perform QAlQC - This will include <br />performing the TYLI internal QA/QC <br />review for all 35% plans, including those <br />to be performed by subconsultants. <br /> <br />Task 5 - Perform Field Desi$!n Surveys and <br />Topo$!raphic Mappin$! <br />The following efforts will be performed for this task: <br /> <br />~ Prepare Aerial Base Mapping. It is assumed that <br />the Caltrans A-B-C approval process will not be <br />required. <br />~ At conform locations, ground field surveys will be <br />performed to insure the new engineering design <br />fits the existing field conditions. The appropriate <br />Utility (surface/sub-surface) infrastructure will be <br />located as needed to complete the project. <br />It is assumed that sufficient horizontal and vertical <br />controls are located within a reasonable distance to <br />the site, and that property corner/ ROW <br />monumentation is findable and usable to easily <br />determine the boundary lines. <br /> <br />Deliverables <br />. Three sets of 1 "=20' scale layout <br />. Preliminary construction cost <br />. Minutes of plan review meeting <br /> <br />The TYLI team will develop three alternative <br />site furniture families to explore a range of <br /> <br />n'-LININTERNATlONAL . <br /> <br />Page 8 <br />TYU 831023.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.