Laserfiche WebLink
<br />Attachment 2 <br />Construction Management Services <br />Redwood City RW Pipeline <br />Bid Package 8 <br /> <br />7. Field Orders (FO) and Field Directives (FD) <br />a. In the event that the Contractor encounters a time sensitive <br />problem where it is not practical to take time to negotiate a <br />settlement, the eM wil( issue a FO. AU work done under a <br />FO will be completed on a time and material basis. The <br />eM and the City of Redwood City will execute the Fa. <br />b. Field Directives will be issued to the Contractor when the <br />directed work is to proceed under protest. <br />8. Progress Payments <br />a. Administrate the preparation and processing of the monthly <br />progress payments. <br />9. Scheduling <br />a. Review and work with the Contractor in their development <br />of the initial baseline schedule and preparation of the <br />monthly updates. <br />b. Provide written comments to the Contractor on the <br />baseline and update schedules. <br />c. Maintain an "as-built" schedule to track the Contractors <br />daily efforts during construction. <br /> <br />II. Field Inspector (FI): Jonathan Cowsert <br />A. Project Responsibilities <br />1. Field Observation <br />a. Provide field observation services to monitor compliance <br />with Contract Documents. <br />b. Prepare a daily inspection report documenting all field <br />activities, field crews, Contractor equipment, and field <br />problems. <br />c. Submit all daily inspection reports to the CM. <br />d. Coordinate with the CM to maintain the database, <br />implemented by Covello, for daily observation reports and <br />photographs. <br />e. Provide photographic documentation of the project prior to <br />construc.:tion, and maintain photographs of field activities <br />for status monitoring of the project. <br /> <br />III. Special Inspections, Testing <br />A. Schedule and coordinate special inspections, materials testing <br />1. Covello will contract for the following special services: <br />a. Concrete quality control and testing <br />b. Soils testing <br />c. Geotechnical services <br />B. The City of Redwood City will contract separately for any hazardous <br />materials inspections, testing or consultations. <br />C. The City of Redwood City will contract for all other design related <br />services. <br /> <br />October 24, 2008 <br /> <br />Page 2 of 3 <br /> <br />6.1C <br />Page 18 <br />