My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-02-09 reg
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-02-09 reg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2009 9:23:04 AM
Creation date
2/5/2009 3:07:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
2/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IX. Project Closeout <br />A. The Contractor will furnish record documents, which Covello will turn over <br />to DC for conforming and final issuance to the City of Redwood City. <br />B. The Contractor will furnish system Operation & Maintenance Manuals. <br />C. Final Inspection and Punch Ust <br />1. Covello will have primary responsibility for conducting the final <br />inspection. <br />2. The City of Redwood City will participate and provide input on <br />final inspection. <br />3. DC will provide design input on final inspection items. <br />4. Covello will have oversight and final review responsibility for the <br />final inspection. <br />a. Covello will prepare the list of outs"landing deficiencies. <br />b. Covello will prepare and issue the punch list from the list of <br />deficiencies. <br />c. Covello will have primary responsibility for verifying that <br />punch list work is complete. The City of Redwood City will <br />have secondary responsibility. <br /> <br />Attachment 2 <br />Construction Management Services <br />Redwood City RW Pipeline <br />Bid Package 8 <br /> <br />6.1C <br />Page 19 <br /> <br />X. Warranty Coordination <br />A. Maintain a Warranty File <br />B. The City of Redwood City will coordinate warranty work after the start of <br />the warranty period. <br /> <br />October 24, 2008 <br /> <br />Page 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.