Laserfiche WebLink
<br />6.10 <br />Page 2 <br /> <br />5. Customer site retrofits for each existing private or public site with a landscape <br />irrigation meter. Retrofits will occur as each property owner ag rees to convert to <br />recycled water for landscape irrigation and industrial uses. <br />Status: Retrofit Bid Package 1 (18 commercial sites in the Redwood Shores area) <br />was 1000/0 constructed in time to meet the demands of the 2007 irrigation season. <br />Retrofit Bid Package 2 is 95% completed and is scheduled for full completion in time <br />to meet the demands of the 2008 irrigation season. <br /> <br />Bid Package 8 (see attached map) is the ninth distribution pipeline construction project. <br />The work of this project will connect the transmission piping system in the Redwood <br />Shores area to the transmission piping system in the Seaport area and completes <br />Phase I of the Recycled Water transmission piping system to potentially serve all <br />Redwood City customers east of Highway 101. Piping will be extended along East <br />Bayshore Road, Bair Island Road, Redwood Creek, Highway 101, and Maple Street to <br />deliver recycled water to the Seaport area. More than 1,840 linear feet of PVC <br />(Polyvinyl Chloride) and welded steel pipe, 24 inches in diameter, will be constructed in <br />approximately five months. <br /> <br />The 16 bids received at the bid opening on January 21,2009, are summarized below: <br /> <br /> Bidder Bid Amount <br />Peak Engineering Inc., San Francisco $ 949 450.00 <br />Rodan Builders Inc., Belmont 983,800.00 <br />Synergy Project Management Inc., San Francisco 1,185,326.49 <br />California TrenchJess Jnc., HayWard 1,196,600.00 <br />Delta Excavating Inc., Antioch 1,206,920.00 <br />Ranger Pipelines Inc., San Francisco 1,216,628.00 <br />Con-Quest Contractors Inc., San Francisco 1,326,710.00 <br />J & M Inc., Livermore 1,327,466.00 <br />Pacific Underground Construction Inc.,San Jose 1,340,050.00 <br />JMB Construction Inc., South San Francisco 1,341,625.00 <br />D.W. Young Construction Company Inc., Alamo 1,357,900.00 <br />North Bay Construction Inc., Petaluma 1,394,176.00 <br />Mountain Cascade Inc., Livermore 1,447,295.00 <br />Preston Pioelines Inc.. MilDitas 1,485,877.00 <br />Sanco Pipelines Inc., Campbell 1,498,010.00 <br />K.J. Woods Construction Inc., San Francisco 1,608,000.00 <br />Engin;eef's Estima.te ......... ............ ............ -.. $1,550,000.00..... - .... ...... .. <br />... . . ...... ...,'.. ..... . .... ... ... - <br />Recommended Bidder: Peak Engineering, Inc. <br />Substantiation: Peak Engineeringr Inc., of San Francisco is the lowest responsive and responsible <br />bidder. <br /> I <br /> <br />The low bid of $949,450.00 from Peak Engineering, Inc., is 38% lower than the <br />Engineer's estimate of $1,550,000.00 for the cost of construction. Based upon the bids <br />received, staff believes that the low bid of $949,450.00 is reasonable and responsive, <br />and recommends awarding the contract to Peak Engineering, Inc. <br />