My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:51:32 PM
Creation date
2/18/2021 5:12:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 6 of 53 <br />AGREEMENT <br />NOW, THEREFORE, in consideration of the faithful performance of the terms and conditions set <br />forth in this Agreement, the parties hereto agree as follows: <br />1. Ppoose. The purpose of this Agreement is to guarantee completion of the Improvements <br />and ensure satisfactory performance by Developer of Developer's obligations to satisfy the Conditions <br />pertaining to the Improvements. <br />2. Property Subject to Agreement. The Property described in Exhibit A hereto shall be <br />subject to this Agreement. <br />3. Duty to hsstall_Improvements. Developer will construct, install and complete, or cause to <br />be constructed, installed and completed, at the Developer's sole cost and expense, the Improvements, in <br />accordance with the Improvement Plans (defined in Recital K. above) and to the satisfaction of the City <br />Engineer, in his reasonable discretion. Developer will also supply all labor and materials therefor, all in <br />strict accordance with the terms and conditions of this Agreement. The Improvements shall include, but <br />are not necessarily limited to, all of the following - <br />(a) grading, paving <br />(b) curbs, gutters, concrete walkways, driveways <br />(c) sanitary sewer system, complete <br />(d) permeable pavers <br />(e) water system, complete <br />(f) recycled water system, complete <br />(g) storm drainage system, complete <br />(h) site lighting system, complete <br />(i) street trees <br />6) landscaping and irrigation system complete <br />(k) undergrounding of overhead utilities and trenching <br />(1) all Conditions of the Tentative Map related to the construction of improvements. <br />(m) and all other work, improvements, or construction required by or specified in the <br />abovementioned plans and specifications, conditions of permits and all construction, <br />appurtenances and improvements necessary as reasonably determined by the City <br />Engineer to complete the aforementioned improvements, both within and outside of <br />the Property. <br />The construction, installation and completion of the Improvements and all labor and materials furnished <br />in connection therewith are hereinafter referred to collectively as the "Work." The construction, <br />REV: 04-06-17 PR <br />Page 3 of 29 <br />ATTYIAGR.2017.0731Stanford - Subdivision Improvement Agreement 311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.