My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:51:32 PM
Creation date
2/18/2021 5:12:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.J. - Page 14 of 86 <br />EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />Scope of Services: <br />Project #1: AC Rooftop Unit Replacement <br />Attachment A <br />Contractor shall furnish and replace rooftop AC units (AC -1 & 2) to match existing <br />capacity per the specifications below: <br />m DX Cooling, Natural Gas Heat <br />e Horizontal supply and return <br />9 27.5 Ton <br />208 Volt 60 Hertz 3 Phase Main Power <br />• 5k SCCR <br />Low gas heat capacity <br />® Barometric relief <br />2" MERV 8 high efficiency, throwaway filters <br />10 HP supply fan motor <br />• 0-100% Economizer, dry bulb control with low leak OA Damper <br />• VAV (OTC) with supply VFD w/o bypass <br />■ Hinged service access doors <br />• BACnet communication interface module <br />• eStage high -efficiency unit <br />Y 1 Year whole unit labor warranty <br />• 1 Year refrigerant warranty <br />G Isolation curb adapter <br />Contractor shall provide additional equipment and services for replacement of AC <br />units as outlined below <br />Title 24 Compliant Economizer with fault detection diagnostics <br />LOTO of existing energy sources, as required <br />Crane rigging of new and old equipment <br />Storage of new equipment up to 1 month <br />Disposal and haul away of existing equipment to licensed appliance recycler <br />• Condensate tie-in to existing drain lines <br />■ Duct transitions from existing ductwork to new unit on supply and return <br />• Duct flex connection on both supply and return of new units <br />Sheet metal flashing around base of unit and roofing <br />Structural engineering for attachment only <br />Roofing subcontractor to roof -over new equipment curbs <br />Pre and post replacement air flow reading <br />Straight time labor <br />Project management and supervision <br />Factory startup of equipment <br />REV: 01-22-2021 MI <br />ATTY/AGR.2021 012/Pacific Coast Sales & Service, Inc. (Page 11 of 13) <br />432 <br />
The URL can be used to link to this page
Your browser does not support the video tag.