Laserfiche WebLink
6.J. - Page 14 of 86 <br />EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />Scope of Services: <br />Project #1: AC Rooftop Unit Replacement <br />Attachment A <br />Contractor shall furnish and replace rooftop AC units (AC -1 & 2) to match existing <br />capacity per the specifications below: <br />m DX Cooling, Natural Gas Heat <br />e Horizontal supply and return <br />9 27.5 Ton <br />208 Volt 60 Hertz 3 Phase Main Power <br />• 5k SCCR <br />Low gas heat capacity <br />® Barometric relief <br />2" MERV 8 high efficiency, throwaway filters <br />10 HP supply fan motor <br />• 0-100% Economizer, dry bulb control with low leak OA Damper <br />• VAV (OTC) with supply VFD w/o bypass <br />■ Hinged service access doors <br />• BACnet communication interface module <br />• eStage high -efficiency unit <br />Y 1 Year whole unit labor warranty <br />• 1 Year refrigerant warranty <br />G Isolation curb adapter <br />Contractor shall provide additional equipment and services for replacement of AC <br />units as outlined below <br />Title 24 Compliant Economizer with fault detection diagnostics <br />LOTO of existing energy sources, as required <br />Crane rigging of new and old equipment <br />Storage of new equipment up to 1 month <br />Disposal and haul away of existing equipment to licensed appliance recycler <br />• Condensate tie-in to existing drain lines <br />■ Duct transitions from existing ductwork to new unit on supply and return <br />• Duct flex connection on both supply and return of new units <br />Sheet metal flashing around base of unit and roofing <br />Structural engineering for attachment only <br />Roofing subcontractor to roof -over new equipment curbs <br />Pre and post replacement air flow reading <br />Straight time labor <br />Project management and supervision <br />Factory startup of equipment <br />REV: 01-22-2021 MI <br />ATTY/AGR.2021 012/Pacific Coast Sales & Service, Inc. (Page 11 of 13) <br />432 <br />