Laserfiche WebLink
6.J. - Page 16 of 86 Attachment A <br />o Programmable UC600 BACnet DDC controller <br />■ AC -1 (PEM 1-3) retrofit with BACnet UC600 Controller <br />o Programmable UC600 BACnet DDC controller <br />• AC -2 (PEM 1-4) retrofit with BACnet UC600 Controller <br />o Programmable UC600 BACnet DDC controller <br />• BACnet integration of (2) NEW Rooftop AC Units <br />o BACnet card by OEM <br />o Install zone sensor, Comm Buss, and low voltage cable <br />o Integration and Standard 3D graphics for equipment <br />Furnish and install (5) 7 color touch displays at TCP locations for local overrides <br />■ Project engineering, management, and technical labor to program, integrate and <br />commission the system <br />• Custom computer generated 3D graphics <br />• Operator training (up to 2 hours) <br />• First year parts and labor warranty <br />• Any new control wiring will be run in plenum wiring where not exposed and accessible or <br />in conduit where the wire is not accessible or exposed. <br />• Building Management System shall integrate to the following systems by enabling and <br />disabling through BAS applications and feedback alarm status to the BAS <br />City shall provide: <br />• CAT5 network connection port at 1St floor TCP <br />Fee: <br />City will pay Contractor a total flat -rate amount of $470,379 for completion of both projects <br />listed above. Invoices shall be received on a per task basis per the fee schedule <br />delineated below: <br />AC <br />Bui <br />top Unit Re lacement <br />Automation Svstem <br />REV: 01-22-2021 MI <br />Cost <br />$284,573 <br />$185,806 <br />$470,379 <br />ATTY/AGR.2021.012/Pacific Coast Sales & Service, Inc (Page 13 of 13) <br />434 <br />