My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:51:32 PM
Creation date
2/18/2021 5:12:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.J. - Page 80 of 86 <br />Prepared By: <br />Daniel Martinez <br />BAS Account Manager <br />Cell,1-408-857-9123 <br />Prepared for: <br />David Rios - Redwood City.Org <br />Job Name: <br />Red Morlon Coriirnunity Center <br />112.0 Roosevelt Ave <br />Redwood City CA 94061 <br />Attachment C <br />Pacific Coast Trat, ods <br />Trane Authorized <br />Warranty sorvice <br />Pacific Coast Trane Controls (PCTC) <br />310 Soquel Way <br />Sunnyvale, CA 94085-4101 <br />408 4813700 (24) Hours 408 481-3666 Fax <br />CA State Contractors License # 465656 <br />310 Soquel Way <br />Sunnvvole, CA 94085-4101 <br />40 8.4fi 1.37 00 24 Hours <br />4,08.431.3666 Fax <br />Proposal Based on Following Bid Documents: <br />Engineer: <br />Design Build <br />Date: <br />January 6th, 2020 <br />Proposal Number: <br />L18 -0479a <br />Payment Terms: <br />Net 30 days <br />Building Automation System <br />Trane is pleased to provide the enclosed proposal for your review and approval. We propose to furnish and install a Trane <br />Tracer SC system controller to replace the obsolete Network 8000 hardware (Reuse of TCP enclosure and backplane). <br />Installation for AirFi wireless communication backbone. Retrofit (20) mezzanine VAV zones with new UC210 BACnet VAV <br />hardware (Reuse of existing 24vac and reheat valves and actuators)_ Retrofit (5) TCP panels with UC600 BACnet <br />programmable controllers (Reuse of end devices, low voltage cable and panel backplane). BACnet integration to (2) <br />package AC units. Based on 20% apprentice labor for duration of project. <br />This proposal is based on the following bid documents: <br />No Bid Documents — Owner direct scope conversation <br />Scope: <br />The design of this system will replace existing obsolete Network 800 hardware with new BACnet ms/tp UC600/UC210 <br />hardware. System is web based and will be accessed via customer provided PC through existing LAN. <br />Base Bid <br />[Qty. 1] Tracer SC Building Automation System Controller (Existing) <br />Non-proprietary BACnet protocol <br />Web -enabled interface <br />Standard 3D graphics for equipment are included <br />[Qty.20] VAV Box DDC field retrofit kits utilizing UC210 BACnet AirFi <br />TAG: VAV-01 through VAV-20 <br />Each zone to include.- <br />(1) <br />nclude:(1) Programmable BACnet DDC controller <br />(1) Air valve actuator damper motors <br />(0) Reheat Valve (Reuse Existing) <br />(1) Pressure transducers <br />(1) Discharge air temperature sensors <br />(1) AirFi wireless LED zone sensor <br />Each zone will share: <br />120/24VAC Transformer (Reuse Existing) <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.