My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2021 4:51:32 PM
Creation date
2/18/2021 5:12:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.J. - Page 81 of 86 <br />• [1] Boiler (TCP MZ2-1) retrofit with BACnet UC600 Controller <br />(1) Programmable UC600 BACnet DDC controller <br />[1] AHU-1 (PEM 1-1) retrofit with BACnet UC600 Controller <br />(1) Programmable UC600 BACnet DDC controller <br />• [1] AHU-2 (PEM 1-2) retrofit with BACnet UC600 Controller <br />(1) Programmable UC600 BACnet DDC controller <br />• [1] AC -1 (PEM 1-3) retrofit with BACnet UC600 Controller <br />(1) Programmable UC600 BACnet DDC controller <br />• [1] AC -2 (PEM 1-4) retrofit with BACnet UC600 Controller <br />• (1) Programmable UC600 BACnet DDC controller <br />[Qty. 21 BACnet Integration of (2) NEW Rooftop AC Units <br />• BACnet card by OEM <br />Install zone sensor and Comm Buss low voltage cable <br />Integration and Standard 3D graphics for equipment are included <br />[Qty. 5] Add Alternate#1 <br />Install 7" color touch displays at TCP locations for local overrides <br />Attachment C <br />II. General Inclusions <br />a. Project engineering, management, and technical labor to program, integrate and commission the <br />system is included. <br />b. Custom computer generated 3D graphics will be provided for the scope above. <br />c. Operator training (up to 2 hours) <br />d. Applicable Sales and/or Use Taxes are included. <br />e. First year parts and labor warranty is included. <br />III. Clarifications <br />a. Cutomer responsible for CAT5 network connection port at 15t floor TCP. <br />b. All TCP panels, back planes, low voltage wire, power and terminal block will be reused. Panels retrofit <br />in place. <br />c Based on AirFi wireless communication <br />d. Any new control wiring will be run in plenum wiring where not exposed and accessible or in conduit <br />where the wire is not accessible or exposed. <br />e. Proposal is based on utilizing union prevailing wage labor. <br />f. Base bid is based on straight time labor hours. <br />g. Building Management System shall integrate to the following systems by enabling and disabling through <br />BAS applications and feedback alarm status to the BAS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.