Laserfiche WebLink
<br />. . <br /> <br />R.Ep:ORT. <br /> <br />6.1F <br />Page 1 <br /> <br />To th.e. Honora.ble Mayo:r a.nd: Clty Council <br />P;rom th.e.Oi .... Man.a.. er <br /> <br />February 23, 2009 <br /> <br />SUBJECT <br />Award of Contract - Master Water Meter Replacement Project (Boardwalk Subdivision) <br /> <br />RECOMMENDATION <br />Approve, by motion, the contract documents and award the contract for construction of <br />the Master Water Meter Replacement Project (Boardwalk Subdivision) to the lowest <br />responsible bidder, Ashlin Pacific Construction, Inc. of Petaluma for their responsive <br />and responsible low bid of $86,900.00 and authorize the City Manager to increase the <br />contract amount up to 10% if necessary. <br /> <br />BACKGROUND <br />The master water meters for the Boardwalk Subdivision were installed as part of the <br />original development more than 20 years ago. The meters are part of the public <br />distribution system and are owned and maintained by the city. The four meters have <br />outlived their useful life and are outdated to the extent that services to calibrate, <br />maintain, and repair the equipment can no longer be secured. <br /> <br />The proposed project will replace a total of four six-inch detector water meters. The new <br />meters will be supplied by Compact Fireline, Inc., similar to other units recently <br />purchased by the City. Standardizing equipment throughout the city makes repair and <br />maintenance more efficient, economical, and reliable. <br /> <br />For each meter replaced, the work will consist of removing the existing concrete vault, <br />water meter, piping and appurtenances; installing a new concrete vault, master detector <br />meter, piping and other appurtenances; installing one new retaining wall; and restoring <br />all pavement and landscaping disturbed as a result of the work. <br /> <br />The 21 bids received at the bid opening on January 14, 2009, are summarized below. <br /> <br />Bidder Bid Amount <br />JDB Construction Inc.. San Francisco $83,370.00 <br />Presidio Systems Inc. Livermore 84,800.00 <br />Ashlin Pacific Construction Inc., Petaluma 86,900.00 <br />William G. McCullough Co., Antioch 105,300.00 <br />Platinum Pipeline Inc.. Dublin 105.300.00 <br />Casey Construction Inc., Emerald Hills 106,590.00 <br />EPS Inc., San Mateo 117,100.00 <br />Valentine Corporation, San Rafael 117,369.00 <br />Pacific Underground Construction Inc., San Jose 119,000.00 <br />D & D Pipelines Inc., San Francisco 119,000.00 <br />Lewis and Tibbitts Inc. San Jose 119,100.00 <br />West Valley Construction Company Inc., San Jose 127,550.00 <br />Precision Engineering Inc., San Francisco 129,000.00 <br />Redwood Engineering Construction, Danville 129,496.00 <br />Con-Quest Contractors Inc. I San Francisco 129,970.00 <br />Fermin Sierra Construction Inc., Union City 133,000.00 <br />J & M Inc., Livermore 135,866.00 <br />