<br />To th.e. Honora.ble Mayo:r a.nd: Clty Council
<br />P;rom th.e.Oi .... Man.a.. er
<br />
<br />February 23, 2009
<br />
<br />SUBJECT
<br />Award of Contract - Master Water Meter Replacement Project (Boardwalk Subdivision)
<br />
<br />RECOMMENDATION
<br />Approve, by motion, the contract documents and award the contract for construction of
<br />the Master Water Meter Replacement Project (Boardwalk Subdivision) to the lowest
<br />responsible bidder, Ashlin Pacific Construction, Inc. of Petaluma for their responsive
<br />and responsible low bid of $86,900.00 and authorize the City Manager to increase the
<br />contract amount up to 10% if necessary.
<br />
<br />BACKGROUND
<br />The master water meters for the Boardwalk Subdivision were installed as part of the
<br />original development more than 20 years ago. The meters are part of the public
<br />distribution system and are owned and maintained by the city. The four meters have
<br />outlived their useful life and are outdated to the extent that services to calibrate,
<br />maintain, and repair the equipment can no longer be secured.
<br />
<br />The proposed project will replace a total of four six-inch detector water meters. The new
<br />meters will be supplied by Compact Fireline, Inc., similar to other units recently
<br />purchased by the City. Standardizing equipment throughout the city makes repair and
<br />maintenance more efficient, economical, and reliable.
<br />
<br />For each meter replaced, the work will consist of removing the existing concrete vault,
<br />water meter, piping and appurtenances; installing a new concrete vault, master detector
<br />meter, piping and other appurtenances; installing one new retaining wall; and restoring
<br />all pavement and landscaping disturbed as a result of the work.
<br />
<br />The 21 bids received at the bid opening on January 14, 2009, are summarized below.
<br />
<br />Bidder Bid Amount
<br />JDB Construction Inc.. San Francisco $83,370.00
<br />Presidio Systems Inc. Livermore 84,800.00
<br />Ashlin Pacific Construction Inc., Petaluma 86,900.00
<br />William G. McCullough Co., Antioch 105,300.00
<br />Platinum Pipeline Inc.. Dublin 105.300.00
<br />Casey Construction Inc., Emerald Hills 106,590.00
<br />EPS Inc., San Mateo 117,100.00
<br />Valentine Corporation, San Rafael 117,369.00
<br />Pacific Underground Construction Inc., San Jose 119,000.00
<br />D & D Pipelines Inc., San Francisco 119,000.00
<br />Lewis and Tibbitts Inc. San Jose 119,100.00
<br />West Valley Construction Company Inc., San Jose 127,550.00
<br />Precision Engineering Inc., San Francisco 129,000.00
<br />Redwood Engineering Construction, Danville 129,496.00
<br />Con-Quest Contractors Inc. I San Francisco 129,970.00
<br />Fermin Sierra Construction Inc., Union City 133,000.00
<br />J & M Inc., Livermore 135,866.00
<br />
|