My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Fugro West, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 Fugro West, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2009 9:28:25 AM
Creation date
3/11/2009 9:28:24 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Fugro West, Inc
PROJECT NAME
Geotechnical Study for 611 Heller Street
RMP File Number
304
Date
3/11/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />City of Redwood City <br />February 6, 2009 (Proposal No. 09.027) <br /> <br />In accordance with the applicable permit requirements, all exploration points will be <br />backfilled with a lean cement grout mix. Backfill of the borings will be sequenced such that <br />stabilized groundwater measurements can be obtained from the completed borings prior to <br />backfilling. Drilling spoils will be drummed, labeled, and disposed, most likely as non-hazardous <br />waste. It is assumed that drummed waste will be stored onsite pending disposal. <br /> <br />LABORATORY TESTING <br /> <br />Soil samples collected in the field will be transported to our laboratory for classification <br />and samples will be selected for geotechnical laboratory testing. Laboratory tests will consist of <br />the following, as determined to be appropriate: <br /> <br />. Classification and Index Tests such as sieve analysis and Atterberg limits <br />determinations; <br /> <br />. Moisture content and dry density determinations to aid in the qualitative evaluation of <br />the soil types encountered, their strength characteristics, and for our evaluation of <br />the undocumented fill soils at the previous basement area; <br /> <br />. Triaxial or direct shear strength tests to measure in-place shear strength of cohesive <br />or cohesion less samples, respectively, and <br /> <br />. Up to two laboratory compaction tests for baseline compaction curves of the <br />undocumented fill soils. <br /> <br />GEOTECHNICAL ENGINEERING ANALYSES AND REPORT PREPARATION <br /> <br />Based on the results of our data review, subsurface exploration, and laboratory testing, <br />we will perform engineering analyses to develop conclusions and recommendations regarding <br />the geotechnical aspects of the project. We will summarize our findings in a geotechnical study <br />report that will include, but not necessarily be limited to, the following information: <br /> <br />. Site Plan, showing exploration locations, fill thickness, and material layers <br />encountered; <br /> <br />. Logs of the exploratory borings; <br /> <br />. Laboratory test results; <br /> <br />. Description of general site conditions and physical properties and characteristics of <br />the subsurface soils, including index properties and groundwater level and possible <br />seasonal variations in the level; <br /> <br />. Identification and evaluation of extent of fill, and compressible and expansive soils, if <br />encountered; <br /> <br />. Briefly summarize the project site geology; <br /> <br />. Provide 2007 CBC seismic design parameters, including CBC Site Class Type, and <br />near source factors; <br /> <br />G.\PROPOSED WORK\2009\09027.fjl1 HELLER ST, REDWOOD CITYlGEOTECHIPROPOSAL GEO.fjFEB09DOC 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.