Laserfiche WebLink
<br />3. Centerline stations will be at a maximwn of 100 feet on tangent and a maximum <br />of 25 feet on curves. The following item's spot elevations will be indicated at <br />each 100 foot station: centerline, lip of gutter or edge of pavement, face-of-curb at <br />flowline, back-of-curb, sidewalk, planting strip or landscape area, and right-of- <br />way or property line. It is assumed that centerline station points do not have to be <br />marked on the pavement. <br /> <br />4. Base map topographic survey will extend SO feet past street intersections in all <br />directions. <br /> <br />5. Redwood City elevation datum, NA VOSS, will be used (nearest location to be <br />supplied by City) <br /> <br />6. City's standard legend for drafting annotations will be used. <br /> <br />7. As-BuiltIRecord drawing information from Comeast, PG&E, and SBC (as <br />supplied by City) will be added to survey base maps. <br /> <br />PR~JECT FEES AND MAN-HOURS - The following personnel will provide services <br />for the project: <br /> <br />1. Principal <br />2. Two-Person Survey Crew <br />3. Project Surveyor <br />4. Surveying Technician <br />5. CAD Drafter <br /> <br />The fqllowing tasks will be required to provide the final plans. Below each task is an <br />estimate gf the man-hours required for that task keyed to the personnel listed above. <br /> <br />Right-of-way, bench mark, property line coordination <br />Surveying Technician: 10 hrs. <br /> <br />Field tQpographic surveying <br />Two-Person Survey Crew: <br /> <br />62 hrs. <br /> <br />Computer processing of field data int9 AutoCAD fonnat and processing of City <br />Block Book information. <br />Project Surveyor: 22 hrs. <br /> <br />AutoCAD'drafting: <br />CAD Drafter: <br />I <br /> <br />62 hrs. <br /> <br />Project management, quality control, and plan checking. <br />Principal: 8 hrs. <br />Project Surveyor: 8 hrs: <br />