My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-04-13 clsd and jnt
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-04-13 clsd and jnt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2009 12:54:16 PM
Creation date
4/9/2009 12:34:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
4/13/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />88 <br />Page 23 <br /> <br />As shown in Table 6-1 of the RFP document and below in Table 1, a maximum evaluation score <br />was assigned to each evaluation criteria with aUotal possible score of 500 points. <br /> <br /> Table 1 <br /> EVALUATION CRITERIA AND MAXIMUM EVALUATION SCORE <br /> Maximum <br />Item . Evaluation Criteria Evaluation Score <br />1 Responsiveness to RFP Pass/Fail <br />2 Company's Qualifications & Experience 100 <br />3 Cost Proposal 100 <br />4 SRDC Operations Proposal 100 <br />5 MRF Installation and Startup Proposal (MRF <br /> Equipment Design, Installation & Start-up Pian) 75 <br />6 Materials Marketing Plan 75 <br />7 Environmental Enhancements & Other 25 <br /> Considerations <br />8 Number & Materiality of Exceptions 25 <br /> T()taJ Maximum Score 500 <br /> <br />The ratings from the evaluators were compiled and discussed during several evaluation <br />committee meetings to determine a preliminary ranking of the proposals based solely on the <br />evaluation criteria. The relative rankings were adjusted as new information was analyzed <br />throughout the evaluation process. <br /> <br />The Evaluation Committee's work was discussed with the Selection Committee at meetings held <br />on May 13th, June 11th, and June 25th. On June 25th, the Selection Committee unanimously <br />approved the evaluation committee's recommendation to shortlist SBR and HBC. <br /> <br />The Evaluation Procedures in the RFP (described in Section 6.1) envisioned a short-list being <br />developed prior to technical interviews. After the initial review of proposals, the Evaluation <br />Committee made the determination that all of the proposers met the minimum requirements. <br />Thus, all seven firms participated in the technical interview and presentation process. <br /> <br />PROPOSER SCORING ReSULTS <br /> <br />Proposers' evaluation scores are presented in Table 2, Proposer Evaluation Score, which <br />shows scores for each proposer on each of the criteria. Circled scores represent the best <br />scores. <br /> <br />SBWMA - EC Report <br /> <br />Page <br />5 <br /> <br />1/15/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.