My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2009-05-18
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2009
>
AgdaPkt 2009-05-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2009 9:30:58 AM
Creation date
5/14/2009 4:02:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council and Redevelopment Agency
Date
5/18/2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />6.1C <br />Page 16 <br /> <br />additional costs. To the best of our ability. HBG will provide the Corps with the infonnation necessary to make a <br />jurisdictional determination in accordance with the Rapanos guidance and within the estimated cost. <br /> <br />Phase 2. Corps Permit Authorization Process <br /> <br />Task 1. Prepare Corps Permit Application. HBO will prepare and submit a pre discharge <br />notification for a Nationwide Permit (s) to the Corps for placement of any fill in waters of the <br />United States, including wetlands. The notification will include the standard permit application <br />fonn. project description, technical documentation of the wetland delineation, an evaluation of <br />how the project complies with the conditions of the Nationwide Permit Authorization. Upon <br />client approval, HBG will provide the permit and required documentation to the Corps for <br />review and approval. This proposal assumes that 110 hours of time plus expenses are necessary <br />for this Task. This proposal also tlSS'llltU$ that the client win contrtlct lor and provided ddailed <br />engineer level design documents and planst as needed. <br /> <br />Task 2. Prepare Endangered Species Consultation Documentation. HBG will prepare <br />documents necessary to initiate a consultation with tbe USFWS and NMFS pursuant to Section 7 <br />of the Endangered Species Act and related to potential impacts to federally-listed species that <br />could result from the project These documents are to include a draft Corps letter requesting the <br />Section 'J Consultation, a Biological Resources Assessment report. This proposal assumes that <br />110 hours of time plus expenses are necessary for this Task. <br /> <br />Task 3. Prepare Essential Fish Habitat Consultation Documentation. HBG will prepare <br />documents necessary to initiate an EFH consultation with the NMFS. These documents are to <br />include a draft Corps letter requesting the EFH consultation, an Essential Fish Habitat <br />Assessment report. This proposal assumes that 25 hours of time plus expenses are necessary for <br />this Task. <br /> <br />Ph.s. 3. RWQCB Water Quality Certification Process <br /> <br />Task 1. Prepare RWQCB AppUcatlon for State 401 Water Quanty Certification. HBG will <br />prepare the authorization request for State 401 Water Quality Certification following current <br />RWQCB guidelines for submission. Included with the application submittal wiJl be copies of the <br />environmental assessment. conceptual wetland mitigation plan and alternatives discussion. HBG <br />will also submit with the application package a Stormwater Pollution Prevention Plan (SWPPP) <br />and Post-construction Stormwater Management Plan (SWMP) in order to expedite the approval <br />process. This proposal assumes that 80 hours of time plus expenses are necessary for this Task. <br />HBG assumes the SWPPP and SWMP will be prepared by the Applicant. <br /> <br />Phase 4. BCDC Development Permit Authorization Process <br /> <br />Task 1. Prepare BCDC Application for a San Francisco Bay Development Permit. HBG <br />will prepare the authorization request following current BCDC guidelines for submission. <br />Included with the application submittal will be copies of the environmental assessment, <br />conceptual wetland mitigation plan. This proposal assumes that 80 hours of time plus expenses <br /> <br />M:\Rcdwood Levee 2009\Proposa)s\Redwood Shores Levee mainlcntlnce Proposal Amendment No 4-14-2009.doc <br /> <br />PageS of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.