<br />boundaries of the project site and that any glare resulting from lighting shall be
<br />shielded from adjacent properties.
<br />
<br />12. The applicant shall comply with all applicable Fire and Building codes.
<br />
<br />13. The applicant shall obtain building permits prior to the commencement of
<br />construction.
<br />
<br />14. Any re-paving and re-sealing of the street, as a result of trenching, shall be from
<br />curb to curb and in accordance to City standards.
<br />
<br />15. The construction hours for this project shall generallybe:6,AM-5PM, Monday -
<br />Friday.
<br />
<br />16. Privacy and separation between the rear balcorrtj,~S on the'iQ\,e townhome units and
<br />the adjacent condominium units on the ~~,?terfl, side 6f~~r property shall be
<br />improved to the extent feasible. A vari~tyof!"",measures sn~Mld be considered
<br />including relocating some or all of the9~jl~onies; reducing the si~'@f the balconies;
<br />and by providing screening with ve~;:~t~_~j~p per Cd'q~ition #6. .
<br />
<br />17. Because the older structures on the SUbje~t,~;~~.~r6posed to be derrfOlished may be
<br />infested with termites, the applicant shall obtaj'~{;.~termite inspection report for each
<br />structure prior to demolitic5~,.lf termites are pf~~7rt! the applicant shall have the
<br />structures tented for termite~!!~fmination prior tod~molition.
<br />
<br />:;".:'" . <'::"-:<;:::.:'.:,:..::".
<br />
<br />18. There shall be a posted contact nari1~'a~~pumber o~2site and with the City during
<br />the demolition and construction p.hase~;;;;<.. ;,'
<br />
<br />.:~:.:..:::::\::::.. < '-. .,,' .
<br />
<br />19. The appli~hf'f':;:;~fi~~1fi.;"compIY witl1;the Mitigation Measures from EA 2008-02,
<br />approv~~:,..!y the Pla~'~~fl9 Commission on April 21, 2009:
<br />~l~~h(f~.
<br />
<br />Aesthetic~;i,~,;%j;:;i',ib;'::""""" . ,,'
<br />~~~i,~~!ion M~~:~e'1;i;1:?;mrj~.f-.,tg:Wuilding permit issuance, the project sponsor
<br />/$h;~jjt1;i~i~.;.",it ane~~~!pr lighting-plan that includes only exterior lighting fixtures that
<br />do not :ciU '" direc(l\~~~:,rays to leave the project site and which also do not allow
<br />direct Iign", .:urces:{;:~~~~~PldeScent, fluorescent, or other forms of electric
<br />,q/;. illumination) t~;1"~r direc~.y/vjsible from off-site locations beyond the subject project
<br />-:eroperty and ,^,i~~jn the,<fjroposed development. The plan shall be subject to review
<br />~rng, approval b~'(~~e Planning Division.
<br />
<br />AirQ'~f.l!Y "",!
<br />Mitigati_1,t'easure C-1: The following notes shall be incorporated on the grading
<br />and builgftig plans prior to issuance of grading or building permits and the
<br />measure's shall be implemented during construction activities:
<br />a. Water all active construction and disturbed areas at least twice daily during dry
<br />periods.
<br />b. Cover all trucks hauling soil, sand, and other loose materials or require all
<br />trucks to maintain at least two feet of freeboard.
<br />c. Pave, apply water three times daily, or apply (nontoxic) soil stabilizers on all
<br />unpaved access roads, parking areas, and staging areas at construction sites.
<br />d. Sweep daily (with water sweepers) all paved access roads, parking areas, and
<br />staging areas at construction sites. Dust, sediment, and debris shall not be
<br />washed into the storm drain system.
<br />
<br />Page 5 of 11