<br />because these trees serve as a buffer between the taller structures on site and
<br />adjacent residential uses, if they cannot be retained due to poor health, structural
<br />defects, degradation imposed by construction, etc; the specimen sized replacement
<br />trees should be located along the eastern property line to reduce the impact of lost
<br />canopy on this portion of the site.
<br />
<br />Cultural Resources
<br />Mitigation Measure E-1: Prior to building permit issuance, the project sponsor
<br />shall incorporate via a note on the first page of the construction plans, that should
<br />cultural resources be encountered during site grading or other site work, such work
<br />shall immediately be halted in the area of discovery andithe project sponsor shall
<br />immediately notify the Planning Manager or desjgnee(){~, the discovery. The
<br />applicant shall be required to retain the services of>~i9..~alified archaeologist for the
<br />purpose of recording, protecting, or curating the 2i:scdv~~as appropriate. The cost
<br />of the qualified archaeologist and of any recor~ipg, prote~~ipg, or curating shall be
<br />borne solely by the project sponsor. The ar,c...:,...h.:,....,.'""".a"",..",.eolQg, ist sha11>be",..'....'..,'..',.,.",.:'.'.'":'.:".,,r.,e, quired to submit a
<br />___-'c".":".:.. ..'..........
<br />Cultural Resources Management Plan'i..per<3ltyRequirelileQ'~:1 to the Planning
<br />Manager or designee for review a~~,;>approval that outlines{j\,~J;)e findings and
<br />mitigation methods of curation a'~~<'protecti~p of the resources,.No further
<br />grading or site work within the' ea';'~~1disc",~~ shall be allowed until the
<br />preceding has occurred. Disposition of Nag,~~:~tl1eriCan remains shall comply with
<br />CEQA Guidelines Section 15064.5(e). ThenQt@ on the plans shall be subject to
<br />review and approval of the\~If.1nning Division.
<br />
<br />~'_""'..'..'.,',,:,"'.'.:,'.'..,'.'.',:..'.',",'.'.'.',',',',.."'.'.'.,'..,,'.",....,',..'..,".,.,,.,.,','..",:"".",','.,., '. . ''''':'':.'
<br />.. .:.-...,...,.:...... . ..
<br />
<br />Geology, Soils and Seismi<<'ty""T'.),;..).. .ii.
<br />Mitigation Measures F-1: Pr\~r to buU~;;~:~.)permit is~uance, the applicant shall be
<br />required to submit plans anp sB7ciffca~i~~~:tti'at comply with all of the
<br />recommend~J.~.~n~.:.gf the Geotec~giGal Investi~~ion prepared by David Connell,
<br />Connell G~te:~~J:!:: Inc., dated~~gust 15, 2008. The plans shall include a note
<br />that fO~'".};tjon eX~lations, site grading, slab-an-grade subgrade preparation,
<br />footin~;;e:~~ftions, ~,~d site drainagep~,observed by Connell Geotechnical, Inc.
<br />
<br />':::;(~
<br />
<br />....-...:..'.......'.':.:.'.'.:.:. :,.:.:.:.~~...::.... . .....: -::,......'....::.-:...........::...'.-:.:.:. :....'. '. :.". :......, :..... . .... -:'. - u.... ....
<br />~:J~,;~,~!ion M~;~~:riis;:F4~;,2!.i";,~~~l~mEmtation of the construction techniques and
<br />);;:lettQSi~ ' ,,~trol ':11J~.~~ures reqt.ii'red by the City of Redwood City Public Works
<br />Departfrr'.,.. '.ouldr~~:te the geotechnical impacts to a less than significant level.
<br />Such meas . include;:~:,':.,,,i'
<br />J:.a. A gradin ::::.mit will be required. Include a table on the site plan showing the
<br />,is;,. quantities Ot'~~ut and;fill.
<br />-~f";':lhe plan s~~;:!l1ust include a grading and drainage plan prepared by a licensed
<br />{;tm~~ressionatii~hat includes existing and proposed spot elevations and drainage
<br />fl~~::i,,;i;~rro~~" to demonstrate proper drainage of the site. Downspouts and
<br />spla~~,:.~Jocks should be shown on this plan, as well as any drainage features
<br />such :ss swales, inlets and outlets.
<br />~1;
<br />
<br />Hazards and Hazardous Materials
<br />Mitigation Measure G-1: Prior to demolition, a complete asbestos survey shall be
<br />conducted in accordance with National Emissions Standards for Hazardous Air
<br />Pollutants (NESHAP) guidelines. If any A licensed asbestos abatement contractor
<br />shall be retained to abate identified asbestos-containing material in accordance
<br />with National Emissions Standards for Hazardous Air Pollutants (NESHAP)
<br />guidelines and all applicable regulations prior to building demolition.
<br />
<br />Page 7 of 11