My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 RKH,Traffic and Circulation Consultant Services
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Under 60k
>
Agmt09 RKH,Traffic and Circulation Consultant Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2009 10:22:46 AM
Creation date
6/8/2009 3:32:37 PM
Metadata
Fields
Template:
Agreement
Contractor Name
RKH, Transportation Engineering Consultant -Traffic & Circulation Consultant Services
PROJECT NAME
Agmt for Traffic & Circulation Consultant Services (RKH)
Date
6/8/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Everest Charter High School. Redwood City <br />Proposal to Provide Traffic Engineering Services <br /> <br />B. RKH will evaluate on-site circulation with respect to student and drop off and <br />pick up areas as well as and pedestrian and bicycle circulation. <br /> <br />C. RKH will evaluate the project's compliance with City Code parking requirements <br />and will estimate peak parking requirements based on data contained in Parking <br />Generation, 3rd Edition2. <br /> <br />6. Draft Report. RKH will prepare a draft report with text and graphics which will contain <br />the traffic impact analysis, findings, conclusions and recommendations for mitigating <br />identified traffic impacts. RKH will submit the draft report to the city for review and <br />comment. <br /> <br />7. Final Report. Upon receipt of written comments on the draft report, RKH will prepare <br />the final report. The final report will be submitted to the city for use in the project review <br />and approval process. <br /> <br />8. Public Meeting. RKH will attend one public meeting on the project. <br /> <br />ADDITIONAL SERVICES <br /> <br />The following are services outside of and in addition to those described as Basic Services: <br /> <br />1. Extra work due to changes in the project, delays, work not specifically described in the <br />Basic Services, and all other causes not the fault of RKH; <br /> <br />2. Changes in documents after approval and/or acceptance; <br /> <br />3. Collection and evaluation of new traffic data not specified in the Basic Services; <br /> <br />4. All public agency permits and permit fees, licenses and other such charges associated <br />directly with the project; <br /> <br />5. Attendance at public meetings not specified in the Scope of Basic Services. <br /> <br />6. Preparation of a Transportation Demand Management Plan. <br /> <br />7. Construction plan checking. <br /> <br />8. Construction review. <br /> <br />3 <br /> <br />2 Institute of Transportation Engineers, (Q 2004. <br /> <br />~.wu <br />
The URL can be used to link to this page
Your browser does not support the video tag.