Laserfiche WebLink
<br />7A <br />ATTACHME~~ae 9 <br /> <br />boundaries of the project site and that any glare resulting from lighting shall be <br />shielded from adjacent properties. <br /> <br />12. The applicant shall comply with an applicable Fire and Building codes. <br /> <br />13. The applicant shall obtain building permits prior to the commencement of <br />construction. <br /> <br />14. Any re-paving and re-sealing of the street, as a result of trenching, shall be from <br />curb to curb and in accordance to City standards. <br /> <br /> <br />15. The construction hours for this project shall generall <br />Friday. <br /> <br />AM-5PM, Monday - <br /> <br />16. Privacy and separation between the rear balco <br />the adjacent condominium units on the t <br />improved to the extent feasible. A va . <br />including relocating some or all of the <br />and by providing screening with vag <br /> <br />e townhome units and <br />property shall be <br />d be considered <br />'< the balconies; <br /> <br />ita and with the City during <br /> <br />from EA 2008-02, <br /> <br />i1ding permit issuance, the project sponsor <br />'or ligh I n that includes only exterior lighting fixtures that <br />rays tb leave the project site and which also do not allOw <br />. descent, fluorescent, or other forms of electric <br />isible from off-site locations beyond the subject project <br /> <br />Air <br />Mitiga asure C-1: The following notes shall be incorporated on the grading <br />and bui plans prior to issuance of grading or building permits and the <br />measu~ shall be implemented during construction activities: <br />a. Water all active construction and disturbed areas at least twice daily during dry <br />periods. <br />b. Cover all trucks hauling soil, sand, and other loose materials or require all <br />trucks to maintain at least two feet of freeboard. <br />c. Pave, apply water three times daily, or apply (nontoxic) soil stabilizers on all <br />unpaved access roads, parking areas, and staging areas at construction sites. <br />d. Sweep daily (with water sweepers) all paved access roads, parking areas, and <br />staging areas at construction sites. Dust, sediment, and debris shall not be <br />washed into the storm drain system. <br /> <br />Page 5 of 11 <br />